Construction and installation engineering is related to people's life,the security of electrical and mechanical equipment installation and operation is directly related to the fundamental interests of the masses.Aba mobile office building installation project was filled with a lot of risk factors,because the project have many uncertain factors such as complex environmental factors,high standards of technical factors and capital factors;At the same time the complex of operating environment,and the management level of is uneven,threaten project successfully completed.Based on this background,this article to aba mobile office building mechanical and electrical installation engineering project as the research object,with knowledge of project risk management system and tools as a guide,combined with the three stages of project which is preparation stage,implementation stage and operation stage,to discussion and analysis the project's risk identification,risk assessment and risk control,to ensure the aba mobile office building successfully completed.At first,this article elaborated the research background and significance,content and method about in this paper.Based on it,reviewed the theories about project management,project risk management and so on,and combed and summarized the research of project risk management to lay the foundation of follow-up studies.And then using case study method to analysis of the present situation of aba mobile office building installation engineering,combining with the different characteristics of the three stage,using the methods of questionnaire survey analysis the risk in the project.Then on the basis of project risk identification,using multidimensional risk matrix and fuzzy comprehensive evaluation technology to assess risk of the three phase project risks.On the basis of risk identification and assessment,this article given the corresponding policy,in order to make the project successfully complete.The last is conclusion of this paper.In general,the study of management conform to the reality,and provide some protection of equipment safe operation.At the same time,it provides a better way to think and guide the similar projects in the future,so it has important value and far-reaching effects.
Keywords/Search Tags:Installation project, risk management, risk identification, risk assessment, risk control
PDF Full Text Request
Related items