Research Of Schedule Management To A Grid Involved Technical Reformation Project Of Datang Chagan Wind Field

Posted on:2016-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:Z G ShangFull Text:PDF
GTID:2272330467981514Subject:Project management
Abstract/Summary:PDF Full Text Request
Wind power enterprises develop rapidly in recent years, wind power rapidlydevelop in the northeast, north China, northwest area in our country, a large area ofwind farm quickly input to the already weak power grid caused great impact. So toensure the safe and stable operation of power grid, the state grid company of windfarms on web technology reconstruction project, in view of the wind farm someproblems in the operation, management, puts forward modification opinions, windfarms according to the file spirit and field devices from the new equipment technicalreform, so as to meet the requirement of power grid companies, to enhance theoperation reliability of the wind power equipment and power grid security.This article aims to analyze datang chagan hadad wind farm on networktechnology renovation project in the process of construction, renovation projectcrossing project is more, new and old equipment running at the same time, theconstruction of regional security risk degree is higher, construction schedule setunreasonable and so on various aspects of the summary analysis. Mainly aimed at thescene in the process of transforming the progress is not ideal, delay and delaysituation analysis, to find the project in the construction process, schedule delays,lagging project is the root cause of the lack of scientific management method, inconformity with the actual progress, failing to optimize schedule management processat the same time, the project behind schedule. After finish the analysis at the sametime, and the management of the other factors are analyzed, combining with twoanalysis, the construction project progress management, organize the implementationof network diagram technology management factors.Through the technology of network diagram for datang chagan hadad wind35kv system on network technology renovation project in the process of theconstruction project decomposition, at the same time, according to the calculation of the working hours and the whole construction period, etc., to establish a more accordwith the actual project progress plan, clear the critical path of the project, establishedaccording to the time limit for a project requirements to complete the whole projectschedule network diagram. At the same time, according to each stage of constructionschedule network diagram, has been clear about the "four stages" in the process of theconstruction network program diagram, do not conform to the requirements of theconstruction progress, must be optimized. After complete the optimization of networkdiagram, the list using the front comparison method and comparison method againtwo comparison method to wade network technical renovation project schedulecontrol all stages of comparison, in order to control the whole project schedule ateach stage. In this paper, by using the construction progress dynamic observation, theconstruction progress is adjusting the comparative analysis, progress three job control,and control the whole process of construction progress control, to ensure thesubsequent project can be in the process of implementation and carry out scientificand effective.In the last part of this article, based on the actual situation of the scene made theimplementation of the project schedule management and implementation of securitymeasures, to ensure that the project control in the control. Mainly through contractmanagement, risk control, information management, progress control of professionalpost and schedule control regularly report established the implementation of schedulemanagement in five aspects; And approval process by optimizing the managementstructure, the optimization system, perfecting the time limit for a project performanceevaluation at regular intervals and the project schedule control to coordinate sevenaspects, such as establish the safeguard measures on the implementation of projectschedule management. And all the information content in the project constructionprocess of the entire application.This paper as the involved a part of the network technology revamping projectimplementation, the long-term work for a line of production, of the network someproblems during the technical renovation project for recording and analysis, throughthe project schedule management network graph technology, optimize the whole ofthe involved network technical renovation work progress of the project, in the time limit for a project with outstanding achievements and work arrangement. Thescientific and effective by adopting the technology of network diagram can bedetermined, with the actual construction project schedule optimization, can shortenproject period, optimal configuration of project resources, is the project workingrelationship clear, professional clear between tasks, is advantageous to theconstruction site management.
Keywords/Search Tags:Technical renovation, Construction schedule, Network diagram, The key line
PDF Full Text Request
Related items