Font Size: a A A

Research On Progress Management Of Contaminated Soil Remediation Project In A Pharmaceutical Factory

Posted on:2019-07-13Degree:MasterType:Thesis
Country:ChinaCandidate:B SunFull Text:PDF
GTID:2321330566466169Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
Pharmaceutical enterprise is an important part of the national economy,is an important guarantee of national health,pollution and governance problems of pharmaceutical enterprises has long been the important influence factors of enterprise production,the guiding ideology of Scientific Outlook on Development and protect the environment under the urgent need of repair for the formation of pharmaceutical enterprises pollution control debts long soil pollution facts.At the same time,with the adjustment of the economic structure of the city,the land of Shouguang City Center Implementation of the cage for a bird,the A pharmaceutical factory land replacement in order to expand the space of city development,in this context,A pharmaceutical companies need to land land restoration,in order to meet the changing nature of land use and environmental protection requirements.Therefore,the land repair of pharmaceutical enterprises has an important role.The implementation of land remediation project received a variety of factors,including the progress of the project management is the key to the success or failure of the project so this paper to meet the demand of the social demand and the practice,the choice of land restoration project management as a research subject,from the practical perspective,using literature research,case study,quantitative analysis methods,research discusses the project schedule management plan to repair contaminated soil A pharmaceutical formulation and implementation of the program,so as to provide a useful reference for the implementation of the project.The main research contents of this paper can be divided into six parts: first,introduction part outlines the research background,research significance,research status at home and abroad,the research contents and research methods;second,introduction to the theory of project schedule management,soil remediation of related concepts,the concept of project schedule management,project schedule management,project schedule the characteristics of management based on project schedule,project schedule control theory,lay the theoretical foundation for this study;third,pharmaceutical project of contaminated soil remediation progress management situation,the analysis of contaminated soil remediation project based on the A medicine factory,discusses the main factors affecting the progress of the project management,and analyzed the progress of the project management meaning;fourth,pharmaceutical project of contaminated soil remediation schedule planning,project schedule planning analysis Requirements for decomposition,the project project responsibility allocation,project work,determine the logical relationship between project work time estimation,and thus the preparation of the project schedule;fifth,pharmaceutical project schedule control for remediation of contaminated soils,confirm the project schedule control,project schedule control process,monitoring the implementation of the project schedule control,and optimize the project schedule management based on PDM method.At the same time,using the method of earned value analysis,the performance of project progress is analyzed.The sixth part puts forward the safeguard measures of project schedule management,including schedule plan,technology,safety construction,civilized construction,management and funds,so as to ensure the smooth implementation of the project.
Keywords/Search Tags:acontaminated soil, repair, schedule management, PDM method
PDF Full Text Request
Related items