Font Size: a A A

The Study Of The Problem Of Enviromental Impact Assessment In County Level

Posted on:2017-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:J WangFull Text:PDF
GTID:2311330512457727Subject:Public administration
Abstract/Summary:PDF Full Text Request
In today's green development, environmental administrative licensing plays an important role in the government's decision-making process of environment. Among them, environmental impact assessment approval (EIA) is one of the most important environmental administrative licensing, which plays an important role. Environmental impact assessment approval in the local environmental protection work can play an early prediction of the construction project on the environment of pollutant emissions, prevention of environmental pollution accidents, a significant degree of reduction of environmental pollution accidents, from the source to reduce the environment The role of pollution. At the same time, the environmental protection departments at the county (district) level in the grass-roots level, construction projects in its area of jurisdiction, can be more convenient to carry out routine supervision and control, Do a good job of environmental impact assessment approval for the construction of a better understanding of the project to understand the project will be completed after the pollution caused by the environment, to take preventive measures, pollutants should be the implementation of emission standards and other content has a great Help and do a good job in environmental impact assessment in the process of government decision-making can provide environmental protection reference, in order to reduce environmental pollution provides an effective means and measures.In this paper, the environmental protection administrative license and the environmental impact assessment of the relevant concepts of the approval of the discussion, at the same time on Haibowan environmental administrative examination and approval of the situation were introduced, and Haibowan current environmental impact assessment process approval process and characteristics One by one were introduced. As a resource-based city, Haibowan has strong environmental protection and is one of the 12 pilot counties in the Inner Mongolia Autonomous Region. It has the same EIA approval authority as municipal environmental protection bureaus, So the issues reflected in the EIA approval are representative, which can reflect the problems existing in the current EIA approval authority decentralization to county (district) level, such as the uncertainty of the approval authority, the uneven level of EIA institutions, "Red roof phenomenon", part of the approval authority environmental impact assessment approval lax, "power to rent", the process of environmental impact assessment of public participation in the lack of environmental protection administrative departments of punishment, environmental impact assessment no alternative programs Happening.On this basis, the paper analyzes the causes of these problems and puts forward some proposals to improve the environmental administrative examination and approval at the county (district) level, with a view to carrying out the decentralization of environmental impact assessment approval authority to the county) Level of this work to play a reference:the government departments need to further change the government functions, the establishment of a scientific concept of development; relevant approval departments to optimize the environmental impact assessment approval management system to enhance public participation in the environmental impact assessment report Add to the alternative program; the proposed national legislative departments to further improve the environmental impact assessment of the relevant laws and regulations.
Keywords/Search Tags:environmental administrative license, environmental impact assessment approval, construction projects, Haibowall areas
PDF Full Text Request
Related items