The Case Study On Project Schedule Management Of Oil/Water Separation For The Sewage Pool Of Company H

Posted on:2016-10-28Degree:MasterType:Thesis
Country:ChinaCandidate:H B LiFull Text:PDF
GTID:2311330482467394Subject:Project management
Abstract/Summary:PDF Full Text Request
Since the original design flaws of the sewage pool of company H have seriously affected the company’s production safety, become a bottleneck in the development of the company. Therefore, the project schedule management of oil/water separation for the sewage pool of company H is very important for the future development of the company. Scientific and rational project schedule management approach enables the oil/water separation project conduct orderly and efficient. Critical chain method as more scientific and reasonable project schedule management method will provide a beneficial ways and solution to solve the problem for the project schedule management of oil/water separation for the sewage pool of company H.Based on the application of critical chain method in project schedule management of oil/water separation for the sewage pool of company H were analyzed, this paper will provide a solution for project schedule management of oil/water separation for the sewage pool of company H. This paper main use case studies, combined survey and literature research. The case studies regard the project schedule management of oil/water separation for the sewage pool of company H as the particular object of study, the survey is conducted to interview project leader staff of design technology department, production department, purchasing department, planning department, engineering department and production workshop of company H, and the project construction of company D. Through the literature research is to obtain information documents, in order to fully and correctly understand the theory of project schedule management.On the basis of the review of theory of project schedule management and the actual situation interview survey of project schedule management of oil/water separation for the sewage pool of company H, this study was based on the critical chain method put forward practical measures for project schedule management of oil/water separation for the sewage pool of company H. First of all, to design scientific project schedule management, including the establishment of the project schedule management team, the project work breakdown (WBS), task time estimates, solving critical chain and buffer settings; Second is to coordinate and control the concrete measures; Thirdly, identify all kinds of factors affect the construction period and make contingency plans; Finally, to do a good job of the project acceptance.
Keywords/Search Tags:Oil/Water Separation for the Sewage Pool, Project Schedule Management, Critical Chain Method, Case
PDF Full Text Request
Related items