Font Size: a A A

Research On The Management Mode Of The Government Investment Project (Civil Engineering)

Posted on:2017-03-06Degree:MasterType:Thesis
Country:ChinaCandidate:P ZhouFull Text:PDF
GTID:2309330485472737Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
In recent years, as our country extends investment scale of large infrastructures, public facilities and ecological environment engineer, project management quality, project construction and fund attract extensive attention. In different stages of economic development, different management modes are formed to solve some specific problems. Market economy develops rapidly today, there are some problem that cannot be ignored in different degrees of typical management modes.Firstly, the current management situation of government investment, research results and future development direction are qualitatively analyzed based on a lot of references. Secondly, concept, classification and characteristic of non-operating government investment projects are briefly described. Characteristics of construction projects in different classifications are analyzed. Special properties of non-operating government investment projects are clearly put forward. Management modes of developed countries like the United States, Britain, Japan and Singapore are studied. Management characteristics of laws and regulations, investment decision-making, contract management, supervision mechanism and procurement system are pointed out by using list methods and chart methods. In the study of management modes of Shanghai, Shenzhen, Beijing and Hong Kong, the advantages and disadvantages are analyzed. Compared with management modes of developed countries, problems of typical management modes in management system, management concept, operation mechanism and supervision system are put towards. With actual case of Beijing Plain Afforestation Project, disadvantages of decision-making and construction procedures, supervision mechanism and accountability mechanism, preparation work, construction land change and evaluation mechanism after project completion are pointed out, and applicable measures and advices of perfecting the fund allocated, strict auditing system, establishing the incentives and establishing Non-operating Government Investment Project Administration are put forwards, which can provide the guidance in both theory and practice for this kind of projects. The results of project completion are confirmed by using reform of project management modes and utilization efficiency of government investment funds are improved.
Keywords/Search Tags:Non-operating items, Government Investment, Project management mode, Project Management Bure
PDF Full Text Request
Related items