Font Size: a A A

Research On The Construction Of Coal And Electricity Integration In The Two Phase Expansion Project Of HJB Company

Posted on:2016-07-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y G WuFull Text:PDF
GTID:2309330482465833Subject:Business administration
Abstract/Summary:PDF Full Text Request
Since the electric power system reform in 2002, the electric power development has made considerable progress, and the power market environment has changed greatly. Sustained and rapid growth of the national economy has increased the demand for coal, sharpened the contradiction between supply and demand, leading to rising coal prices. Enter since 2012, due to slow the country’s macroeconomic growth, iron and steel, nonferrous metal, chemical high energy consuming industry malaise, a slowdown in demand for electricity, coal demand will decline, also due to the international coal prices, coal imports poured into other factors, rapidly changing domestic coal supply and demand, coal prices fell trend emergence.Electricity market and the rapid changes in the coal market, so that the traditional business structure of a single power group and coal group have chosen to cooperate, to avoid market risks. Under this circumstance, the integrated construction mode of coal and electricity came into being.In this paper, the HJB company 2 x 1000000 kW unit project for coal and electricity integration construction mode research, from the project essential condition, economic benefits and social benefits and other aspects of analysis, put forward a different from the first phase of the project management mode, indicating that the project has a high return on investment benefits.
Keywords/Search Tags:coal and electricity integration, construction mode, return on investment
PDF Full Text Request
Related items