The Case Study On Schedule Management Of NHI Mining And Metallurgy Equipment Customized Project

Posted on:2015-11-19Degree:MasterType:Thesis
Country:ChinaCandidate:L P MaFull Text:PDF
GTID:2309330467485470Subject:Project management
Abstract/Summary:PDF Full Text Request
NHI Mining and metallurgy Equipment branch.is subsidiary of North Heavy Industry Group Co., Ltd.(NHI), which is a large mining and metallurgical equipment supplier, therefore, the equipment delivery issue plays a crucial role in the company’s performance and profit. However, due to various reasons, in many projects’schedule exists problem lead to tardiness in delivery. To improve the project schedule management effectively has been a urgent problem to solve for our company.In this paper mainly adopts the method of analisis actual cases, make research on project schedule management of NHI Mining and metallurgy Equipment branch, doing investigations to discuss the implementation of project progress management. And at last, by virtue of related theories, puts forward improvement measures and programmes.First of all, this paper introduces the main situation of NHI Mining and metallurgy Equipment branch1, and charactics of its projects, project process and organization form, on the basis of the above-mentioned, summarize the recently period of projects on mining and metallurgy equipments, points out the related problems of the project schedule management during the execution in the whole process, and analyses the harm it caused to the project or company. Secondly, based on the theory of project schedule management, identify the key factors:the organization needs to be improved, imperfect preparation and project schedule control, supplier management is out of control, unestablished management team, lack of project schedule management system etc.. Finally, according to the characteristics of projects of NHI Metallurgical, propose several strategy to improve the progress of the project management, respectively are:improve organizational structure, improve project preparation and execution level, optimize supplier management mechanism, enhance the efficiency of project management team, Improve security measures of project schedule management. Through Analysis and study the cases, hope the conclusion of the paper could contribute to the project schedule management of NHI Mining and metallurgy Equipment branch, at the same time, to offer a valuable reference within the industry.
Keywords/Search Tags:Mining and metallurgy equipment, Project schedule management, Criticalchain method
PDF Full Text Request
Related items