Font Size: a A A

Study On Integration System Of Project Management Of GDW Group

Posted on:2016-11-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y D LiFull Text:PDF
GTID:2309330461457120Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With more and more information system project, accelerate the project demand change, group is becoming more and more difficult to deal with. In order to strengthen the project management and control information, enterprises need to make these changes continue to emerge, the demand of orderly, demand management is the management of the development process of the leader, is also the source application challenges.Information system success often depends on whether it can meet the needs of the project, demand management correctly is the key to the success of a project. Demand management information system directly determines the effect of the implementation, also determines whether the information of project management and meet the needs of the business.In recent years, with the rapid development of the energy industry, the construction of the GDW group is the integration of the information system, in order to avoid the integration process of the system construction, the demand can not control, demand management is not standardized, the need for the group to study the integrated system for management. Therefore, I think that the selection of GDW group as the research sample, discusses how to establish management system needs the integration of group, from the system of departmental interaction, demand management and other aspects of closed-loop together, to enhance the group’s integrated information system demand management ability, representative and universal significance.This article from the start through the analysis of the research background, research significance, research contents and methods of the study, pointed out the theoretical significance for the demand management of GDW group and the practical significance. This thesis reviews the literature review on related theories at home and abroad demand management information system.Then, starting from the status quo of information demand management of GDW group, respectively expounds the GDW group and GDW group system integration system of project requirement management status.To objectively understand the information system demand management situation of GDW group, effective experience and failure lessons of the success of informatization construction, find out the universal, key issues, provide the basis for decision making to promote the GDW group informatization demand management level, to provide new ideas for development, to carry out the survey. And the questionnaire for statistical analysis, to analyze the current information system construction and management of internal and external environment, to further clarify the advantages, disadvantages, opportunities and challenges of GDW group project management information system, according to the results of the survey, control, organization architecture division, system demand management standardization, three the key of optimization.According to the actual situation of GDW group informationization project management, combined with questionnaires and interview results, proposed GDW group information demand management problems, demand information system does not carry out management and tracking system, the scale is relatively small, relatively simple functions, integration is relatively poor, the overall business application level is low, it is difficult to support the group operation and intensive and elaborate management, the development of informatization construction of the units directly under the unbalanced, differences, influence the informatization level of the group as a whole, need to improve the understanding of information, organization structure integration needs to be further improved, the scope of construction system is difficult to clear, frequent changes in demand, the system needs to be standardized.The last one focuses on the needs to improve management ability of integration system of countermeasures and suggestions of GDW group, and put forward the concrete, according to the demand management measures, including the construction of enterprise architecture specification, baseline management organization, the integration needs to build a unified standardized, standardized management system, build the PMO platform for auxiliary management tools GDW integrated system needs to lay the theoretical foundation management control.
Keywords/Search Tags:architecture, requirements management, management system, integration
PDF Full Text Request
Related items