| China is gradually entering society from rural to urban society an important period of transition, urban infrastructure is increasingly becoming the focus of urban construction. Emerging as a new mode of construction project financing after2000, BT mode begins major problem in our country, in promoting the process of urban infrastructure construction, improve efficiency in the use of government funds to play an active role in promoting. Private capital to seize the opportunity, have to consider and try to invest in infrastructure construction.Discussed in this thesis BT WH stadium construction project is the GD company as an investor, with large Obihiro ongoing pre-negotiate with the preparation of the project. The project for the city as part of the construction of the new city by Mass Art, museums, libraries, stadiums three main buildings, with a total construction area of38,000square meters, the project throughout the period of five years (including construction period and repayment period) a total investment of250million yuan. Thesis of the project, for example, mainly from the following three aspects of project development Construction Model BT Study:1, the investment income calculation:Papers of the project evaluation and preliminary investigation judge matters, a comprehensive overview of the project description, the required capital investment and potential earnings for specific estimates for investors to provide financial reference;2, financing Analysis:Papers of the project financing analysis to determine the reasonable financing, financing cost estimates for proposed different from the general sense of the supply chain financing, innovation and a more applicable to the project’s financing;3, risk estimation and prevention:BT construction mode higher risk than ordinary building construction, the paper discussed the WH venue construction projects, investment side, the risks can not be ignored. Comprehensive analysis of papers that may exist in the project risks, accurate and comprehensive risk identification and evaluation, and for various risk collate specific risk control measures and measures.Conclusions of this study and the calculations based on project-specific analysis, highly targeted, GD operating the project for the promotion and protection play a role. |