Font Size: a A A

Research On The Risk Of Construction Consulting Company Specialized In State-owned Project

Posted on:2015-06-25Degree:MasterType:Thesis
Country:ChinaCandidate:L J LanFull Text:PDF
GTID:2309330431978707Subject:Business administration
Abstract/Summary:PDF Full Text Request
This paper is the summary of the government investment project constructionmode. Which discusses the background and reasons of acting system and theoreticalbasis, the basic connotation of acting system is given. And introduced the currentgeneration of several basic models as well as the organizational system of thegovernment investment construction project implementation procedures, laying thegroundwork for the research of agent risk.The domestic study of agent risk mainly confined to theoretical exploration stagetoday. And whether it is related with construction risk management theoretical research,or to instruct the practical work of construction is one of risk control research, are verylimited. More and more facts to prove: risk management is the survival of theenterprise, especially directly affects the economic benefits of enterprises. Forconstruction, do a good job in construction project risk management for the enterprisecan reduce costs, increase profits, improve the quality of the major decisions; Forexternal, the enterprise can be established good reputation, help build partnerrelationship, or project owner with the government to improve the performance of thegovernment investment projects. So the aim is to: hoping for construction risk research,put forward the corresponding countermeasure, to solve the implementation of agentconstruction faces many problems. Based on the agent risk analysis, and put forwardthe reasonable way of risk sharing and risk management and preventive measures onboth sides. For the government, except on the micro enterprises should strengthen thesupervision, macro should take corresponding measures to more for theimplementation of the agent to provide a good external environment and legalprotection; And for the construction party, in the whole process of project construction,strict risk management. Internally to fully understand the risk, risk preventionawareness and develop project risk coping strategies, foreign through engineeringguarantee and engineering insurance risk prevention, strengthen the contractmanagement.
Keywords/Search Tags:the government investment projects, acting system, risk management
PDF Full Text Request
Related items