Font Size: a A A

Research On Recycling Economy Project Feasibility In Tianjin Beijiang Power Plant

Posted on:2014-08-11Degree:MasterType:Thesis
Country:ChinaCandidate:H M YuFull Text:PDF
GTID:2309330422968479Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Tianjin Beijiang Power Plant recycling economy project is approved by the StateCouncil, the first batch of national circular economy pilot projects, projects take fulladvantage of the Hangu district resource conditions, the solution to the efficient andclean power generation, water conservation, land conservation, desalination,concentratedseawater and utilization of fly ash, a series of problems,"electric waterand salt material to circular economy industrial chain, known as the development ofthe power industry circular economy" northern mode. Each of the projects put intooperation in2009, to provide society with12billion kwh of electricity and65milliontons of fresh water, and provide important energy support and freshwater resourcesand support for the development and construction of the Tianjin Binhai New Area.The purpose of this paper is to summarize the Beijiang power plants recyclingeconomy project experience of an engineering study proposed second phase ofprogram planning and preliminary feasibility study to provide decision support to thepreparatory work of the Northern Xinjiang Project Phase II expansion project.In this paper, on the basis of summing up a circular economy in northernXinjiang project experience, creativity proposed Phase II expansion project programplanning: to continue as a leader, to power generation of electricity, water, heat, salt,and material "integration Integrated Development mode, planning the construction oftwo sets of one million kilowatts of ultra-supercritical generating sets, Nissan30tonsof sea water desalination device, an annual output of1.5million tons of refined saltand30tons of salt chemical products concentrated seawater utilization projects,external heating heating1200million square meters, supporting the construction offly ash utilization projects and pilot project for carbon dioxide emission reductions.The proposed Phase II project planning program from the power system analysis, heatload analysis, use of resources and energy conservation, investment estimation andfinancial evaluation, risk analysis, economic and social benefits evaluation six areasof northern Xinjiang two circular economy the project carried out a preliminaryfeasibility study. For the Beijiang two preliminary work provides important supportand investment decision support program planning.Basis for the planning program and a preliminary feasibility study conclusions, the National Energy Board has issued a document agreeing to carry out preparatorywork, the project feasibility study and EIA access systems, land use pre preliminarywork has been in full swing, planned for the second half of2013, approved by theNational Development and Reform Commission, started construction in2014.
Keywords/Search Tags:Power plant, Circular economy, Program planning, Feasibility study
PDF Full Text Request
Related items