Font Size: a A A

The Business Plan On The Northern Water Supply Project Of Guangzhou Water-supply Corporation

Posted on:2015-09-10Degree:MasterType:Thesis
Country:ChinaCandidate:L L XiaoFull Text:PDF
GTID:2309330422482841Subject:Business administration
Abstract/Summary:PDF Full Text Request
Water, is the source of life, is the source of all things, is an irreplaceable naturalresources. Along with the rapid development in our country, especially in the coastal city, thewater demanding in the cities becomes huger and more and more dependent. Therefore, thecity water supply capability is particularly important.Along with the rapid economic development of Guangzhou city, the improvement thewater supply capacity is imminent, construction of water factory can not only solve the waterdemand of residents, but also can improve the resist suburban private water supply enterprisemarket competition, market risk, suburban water quality unqualified security risks and theurban pipe burst, resulting in a large number of damaged pipelines barbaric construction tapwater natural loss of natural risk.The north water project is located in Baiyun District of Guangzhou City, the project isdivided into two phases of construction, the first phase completed a preliminary scale of watersupply for the600000m3/d period, water plant, to adopt the conventional water treatmentprocess, replace and close the project area of the small town waterworks. Second phase builtthe water supply capacity of1500000m3/d of the two phase of the expansion water, adopt thebiological activated carbon advanced treatment processes, to meet the needs of the market ofwater quantity and water quality requirements.The project as a commercial proposal, analysis methods learned in the MBA classroom,combining theory with practice, to the Guangzhou city water company Northern water supplyproject, analyses the detailed comprehensive. First introduced the general situation, projectinvestment project geographic location of location and water purification process, and thenfrom the market environment analysis confirmed the existence of the project, through thecompetition status analysis and project of water supply and demand of project detailed marketanalysis, the market for positioning, determine the scale of construction projects, constructionorganization design, water supply pipe network design and the determination of the projectschedule. Excellent management team through the elaboration of project and improve theorganizational structure of the project, make investors more believe that implementation ofthe project, the financial investment benefit analysis, sensitivity analysis of the project, thatproject payback period of investment, and combined with the characteristics of the project andthe actual, formulate the project risks and preventive measures, the final the water supplyproject construction is necessary, feasible, valuable conclusions. The construction of the project in the delivery of northern Baiyun District of Guangzhou city with high quality waterat the same time, guarantee and downtown Guangzhou city with the pipe and the water ishomogeneous, with good social benefits of the project. The project not only for investment toattract investment, financing channels, strengthen water supply infrastructure construction,accelerate the market reform, promoting the integration of urban and rural water supply, andcan open up new water supply scope of the market, promote the healthy development of theenterprise sustainability, showing good economic benefit, the northern water plant watersupply projects can create social benefits.
Keywords/Search Tags:business plan, City water supply, The northern water supply
PDF Full Text Request
Related items