Font Size: a A A

The Design And Implementation Of Telecom Engineering Project Management System For Xinjiang

Posted on:2017-04-19Degree:MasterType:Thesis
Country:ChinaCandidate:X F ZhangFull Text:PDF
GTID:2308330488452503Subject:Software engineering
Abstract/Summary:PDF Full Text Request
At present, the construction of telecommunications has attained more and more attention in the country, many domestic cities have already completed a major telecommunications projects. However, like Xinjiang this more off-center, telecommunications engineering construction is much more difficult. Because the different in different parts of the geographical environment and weather conditions, the construction process of telecommunications engineering will be subject to different degrees of impact. And It is hard to find a suitable assistant system to make help to the introduction of telecommunications in Xinjiang. And if the construction of telecommunications engineering entirely on human communication audits, will waste a lot of unnecessary waiting time, resulting in a waste of resources. Therefore, the construction of a telecommunications project for the construction of the Xinjiang telecom engineering project management system is without delay.The system uses SQL Server 2014 database, and B/S structure. The total system is divided into three layers based on SSH architecture:presentation layer, business layer and persistence layer. The presentation layer using Struts receive and sent the request to Action object corresponding to the execution request. Business layer is responsible mainly by Spring in SSH, it receive the request from Action object, and deal with request, then send it to the persistence of the system. Hibernate interacts with the database in the persistence layer, and deals the data request coming from Spring, then return the results.System is mainly to achieve user management, design management, construction management and supervision of management. User management realizes the new user functionality and user queries. Design management realizes design commission sign, search the design of commission sign, search commission design, search design information, search design change, output design task, input design information, and view engineering integrated information functions. Construction management realizes the construction commission sign, inquiry commissioned construction sign, issued under construction tasks, construction tasks forwarding, inquire construction commissioned, apply to start, completed application, acceptance of the application, billing applications, and integrated engineering information viewing. Supervision Management realizes the supervision commission sign, inquire commissioned supervision sign, task hair supervision, task forwarding supervision, commission inquiry supervision, logs supervision, reports supervision, and integrated engineering viewing.After system is implemented and put into use, it will speed up Xinjiang People’s telecommunications construction projects, and bring a lot of positive role to the development of the telecommunications industry in Xinjiang. In addition, it will convenient the header manager of telecommunications engineering to manage and supervise the engineer, and it will also convenient the government to supervise the telecommunication engineer.
Keywords/Search Tags:Telecom engineering, The collaborative management, SSH, SQL Server, Unified modeling language
PDF Full Text Request
Related items