Font Size: a A A

The Design And Implementation Of Military Engineering Full Stage Approval System For Army

Posted on:2017-05-29Degree:MasterType:Thesis
Country:ChinaCandidate:X D DuFull Text:PDF
GTID:2308330488452227Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the progress and development of science and technology, the military reforms continually and the new age has higher requirement for military engineering approval system. Original military engineering approval system focuses on the approval work and the operating force of its oversight, management, later analysis work is far away. In order to solve the problems that traditional systems can’t maintain the basic information efficiently, can’t modify the project information according to actual situation, can’t finish the comprehensive management and the comprehensive analysis for the projects’integral information, related departments get into the study of approval system for military engineering.The military engineering full stage approval system uses the popular B/S structure and SSH framework, and SSH framework uses the MVC design model to promote code reuse. Spring is a lightweight framework based on IOC and AOP theory, which uses POJO to build J2EE applications. Struts is an open source Web application and is used for the development Web application based on Java EE framework. Hibernate uses object relationships to map Java classes to a relational database, making the data retrieve from database more easy and more convenient, which avoids unnecessary database queries. The database uses SQL Server 2014.Functions of the system include engineering information management, planning phase management, design phase management, commission and tender stage management, construction stage management, completed stage management. The engineering information management achieves plan summary management, engineer operation, comprehensive inquiry, unqualified material inquiry, question feedback. Planning stage management achieves plan management, plan operation function. Design management function includes BOQ management, survey and design, drawings reviewing, engineering decomposition, engineering integration, withdrew to integrate decomposition. Commission and tendering stage management realizes delegate management, confirm project, tender management, contract transfer. Construction phase management realizes registered supervision, start reporting, inspection work valuation, construction schedule entry, visa changes, supervision contact list, quality rectification notice, quality supervision station technology quality rectification notice, notice of substandard materials rectification function. Completion stage management achieves report approval, inventory quantities, inspection summary, quality certification, applying for project settlement, settlement approval, acceptance price settlement.During the operation process of military engineering full stage approval system, it not only achieves the efficient maintenance for some basic information and the modifying function for project information according to actual situation, but also completes the comprehensive management and comprehensive analysis for project’s integrated information, and users are satisfactory with this.
Keywords/Search Tags:Project approval, SQL Server, SSH, Unified Modeling Language
PDF Full Text Request
Related items