Font Size: a A A

The Design Control Integration Modulo Scheduling Decision System In Local Power Net Work

Posted on:2015-06-13Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2308330473950606Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Under current economic conditions, the development of increasingly large grid,and increasingly complex. Development of increasingly large grid, and increasingly complex. Faced with increasingly complex and massive information data grid, the grid dispatchers inevitable cognitive impairment, difficult to effectively deal with emergency situations. Intelligent scheduling as dispatchers auxiliary basic needs decisions to help dispatcher’s effective maintenance and management costs savings and aided dispatch management to make scientific decisions.First, the status qua combined with the local grid system scheduling decisions to raise demand, combined with the local grid system scheduling decisions at home and abroad to propose appropriate requirements to carry out detailed analysis and mission established subdivision scheduling decisions and improve local grid system functional requirements, establish analysis of the relationship between use cases and complete project tasks on the basis of needs analysis to determine the functional needs of the various segments of the demand and the need to complete the task. After the completion of the grasp of the needs of the local grid system scheduling decisions, the need to complete the local grid scheduling decision system architecture and design. After completing the above two steps for each module of the system need detailed coding work, mainly working code area includes three aspects, the browser actually writing code, writing web layer interface function code, database stored procedures for preparation of the code. Finally, to complete the project, the local grid scheduling decisions to test the functionality of the system. Test section mainly includes two aspects, namely, black box testing and white box testing, black box testing mainly for the local grid scheduling decision system function tests; white-box testing is depth analysis of the internal branch of the local grid system scheduling decisions testing.In this study the characteristics of the local power grid dispatching business,management status, national smart grid dispatching automation development needs, as well as digital graphics, CIM and other relevant IEC standard, custom device modeling, topology and other technical means to automatically generate online-depth analysis, establish a CIM-based graphic design, open SVG graphical modeling,graphical modeling tool can be customized to achieve the original grid line topologyautomatically generated dynamically in equipment operation module integration diagram shows, etc. according to the different forms of business operation application platform, to improve system scalability and maintainability, while meeting business decisions themes applications without the need to achieve the requirements of the building interactive diagram mode intelligent scheduling. After the actual verification,the subject of the decision-making system designed for the local power grid to meet the requirements of the local power grid.
Keywords/Search Tags:grid scheduling, equipment modeling, chart module integration, database
PDF Full Text Request
Related items