Font Size: a A A

Design And Implementation Of Quantitative Management And Assessment Software For The Work Teams In Electric Company

Posted on:2014-06-24Degree:MasterType:Thesis
Country:ChinaCandidate:J XiongFull Text:PDF
GTID:2308330473458719Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With improvement of national economy, Power industry has become more important and gotten faster development, power grid is more and more complicated, information of management is growing faster and faster, and the request of user to electric power industry is also more and more strictly. Team is the basic unit of electric power enterprises and the final purpose, and construction of Information is the mark to judge the modernization management level of enterprise. This paper describes the background of Team Information Management System, the development of home and abroad, and then introduces the development tools and key technologies of the system. This work also analyses demand, designs the outline and details, implements and tests system during software development life cycle of the system.This paper is divided into seven parts: the portal, integrated monitoring, comprehensive management, business approval, evaluation management, leisure and entertainment and system management. The seven parts can well analyze the team management of electric power enterprise. In order to realize the full integration of information management on team work, this work special emphasis on the quantitative evaluation and ability evaluation for team work.This paper discusses the principle of database design and the development of data platform, goals and the characteristic of the architecture, with the analysis of the system structure, chooses B/S model in order to meet the requirements of advanced feature, reliability, stability, maintenance, safety and good performance. By the way of establishing power team information management system, improving the existing management of power enterprises, realizing information interaction between management and power team, this work can accelerate the circulation of information, improve the management level and work efficiency.
Keywords/Search Tags:Power company work group management, Information Technology, Quantitative Management, B/S Architecture
PDF Full Text Request
Related items