Font Size: a A A

The Application Research On Stable Supply System In Hydro Power Equipment Manufacturing Enterprise

Posted on:2015-08-13Degree:MasterType:Thesis
Country:ChinaCandidate:M MaFull Text:PDF
GTID:2308330452470082Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Hydro power, as a kind of clean and non-pollution renewable energy which withlow transportation cost, is not only beneficial to adjust the peak demand of power andalso conducive to enhance the resource utilization and the comprehensive efficiencyof the market economy. China insists on developing the hydro power as one of thestate energy development strategy based on the rich hydropower resource. On thebackground, the stable supply system of hydro power equipment manufacturing that isbased on the flexible production is researched in the thesis.Firstly, the thesis explains and researches the management of supply chain in thesupply system and production flexibility with the related research including domesticand abroad. The thesis uses the Pareto principle, catfish effect and to build thestructure of supply system theory. And the thesis uses the PERT(Program Evaluationand Review Technique) to build the supply system of the flexible production andconfirm the key points of the purchasing control with the CPM(Critical Path Method,CPM).All of above is the basement theory of application and implementation forflexible production in supply system of manufacturing enterprise.Secondly, the thesis build the material supply system which includes purchasingmanagement, purchasing procedure and supplier management on the base of orderdriven purchasing, and also includes the cooperation model of long-term strategypartnership with suppliers. At the same time, through the summarization and researchof FMS(Flexibility Manufacturing System,FMS), the thesis applies ES (ExponentialSmoothing) method and Lumpy mode to analyze the demand forecast, use ProductAvailability analyze and confirm the decision scope of inventory budget with thestorage supply proportion. All of those are the theoretical reference of building theproduction system.Lastly, the thesis researches an enterprise case, with analysis of the environmentand the supply system situation, the thesis finds the key problems and insufficient inorder to make enterprise purchasing strategy target. After the research the actualsituation, the supply system is built and implemented in the company with the methodof PERT. As a result, the thesis summarizes the efficient methods to manage andimprove the supply system. The research of the enterprise supply system is advantage of building stablesupply system and the long strategy cooperation between the enterprises and thesuppliers. Especially the hydro power equipment manufacturing enterprises may referto the research in this thesis in the implementation of supply system.
Keywords/Search Tags:Hydro power, Flexibility Manufacturing, Lumpy, Cooperation model
PDF Full Text Request
Related items