Font Size: a A A

Design And Implementation Of Huishang Bank Risk Early Warning System

Posted on:2015-04-08Degree:MasterType:Thesis
Country:ChinaCandidate:B HuangFull Text:PDF
GTID:2298330467985498Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Traditionally, bank deposits and accounting supervision afterwards adopt the basic manual handling methods. With the popularity of computer management systems, the computer management level of Bank Risk Early Warning is sharply improving. The pure manual check water ways have been unable to meet the high-speed and efficient bank service needs. Nowadays, computer technology has been more widely applied in the banking sector. In order to improve their service levels particularly in the savings and accounting business processing, some commercial banks have adopted auxiliary monitoring system to replace the traditional manual processing business approach. Therefore, using advanced information technology and changing management mechanism has become the most effective way to solve these problems.Through reviewing the present situation of bank risk early warning system, the method of B/S network business management system based on national standard is proposed, aiming at solving the problems of big potential safety hazard, high cost, poor operational as well as the poor maintenance system. Secondly, for the system demand analysis, the current demands situation of bank risk early warning system is clearly described. At the same time, the system has been carried on the overall design, describing the architecture of the whole system overall, and modeling the system through UML from multi-levels which make the structure more clearly. Then, the system is analyzed in detail, respectively from the user login, system management, information management, the wind control management, statistical analysis and system log management and so on. Finally, the realization of every system module has been fully tested to guarantee the stability of the system.Based on SQL Server database and the mature J2EE technology, the bank risk early warning system has been designed and implemented. In order to guarantee the system security and stability, and conform to the contemporary requirements of bank risk early warning system, the specification of software testing method is used for comprehensive system test. The system improves the work efficiency, ensures the data security and safe operation, and achieves the requirements of the template system.
Keywords/Search Tags:J2EE, Bank risk warning, UML modeling, Black-box testing
PDF Full Text Request
Related items