Font Size: a A A

Cargo Entry And Exit Risk Early Warning System Design And Implementation

Posted on:2012-03-06Degree:MasterType:Thesis
Country:ChinaCandidate:L R YangFull Text:PDF
GTID:2208330332486775Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The process of integration with the world economy, international trade and accelerating turnover is more and more frequent, worldwide circulation of risk and risk harmful biological spread risk is constantly increasing. On September 7, 2001, China formally announced the entry-exit inspection and quarantine risk alert and quick responding regulations on the management of inspection and quarantine, warning of the risks of information collection, risk assessment, risk alarming measures do the rules. Inspection and quarantine risk early warning system is built on the inside of inspection and quarantine, especially for the early warning and risk, lower the risk of a system. The main purpose is to according to the present situation, the risk of inspection and quarantine inspection and quarantine work in structuring accord with actual risk early-warning system and risk prevention defuse mechanism, realize the inspection and quarantine risk management standardized, systematic and scientific and realize the sustainable development of the cause of inspection and quarantine. Basic purpose is to ensure our people, animals and plants in the healthy life, safeguard the legitimate rights and interests of consumers, and protect the ecological environment, promote the healthy development of China's foreign trade.Risk early-warning system should include risk management and social service two architectural systems. Analysis management subsystem include: risk collection, analysis, decision making and warning issued, the regulatory function.This paper illustrates the general design realize the key technology used in; And in the light of system needs, combined with object-oriented design method and design patterns, discusses the applied independently developed by the unity based on J2EE specification software development platform - for risk management subsystem part of the design and implementation, mainly including the system outline design, detailed design, news interface design and data processing layer design aspects content. From the analysis of the demand by the end of the system, the whole process deployment and operation are based on software engineering specifications to implement.In this paper stated the development process, the project from the requirement analysis to system, the whole process deployment and operation are based on software engineering specifications to implement. At present this project has already been put into actual operation and solves the actual demand of users.
Keywords/Search Tags:risk early warning, risk analysis, J2EE
PDF Full Text Request
Related items