Schedule Management Research Of Refuse Crane Project In D City

Posted on:2016-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2272330503958786Subject:Project management
Abstract/Summary:PDF Full Text Request
With the target of enhancing the management level of the enterprise’s project progress and in accordance with shortcomings of the work of the enterprise’s project progress management, the paper takes an undertaken project of construction of the garbagecrab-bucket crane of the garbage incineration power plant in D city as an example,summarizes and analyzes the progress management during the implementation progress of the whole project, proposes suggestions of improvement, and probes into the progress management model which can be applied to similar construction project of the crane, by theoretical knowledge and methods in the filed of modern project management and through detailed analysis and in-depth exploration of the actual project.Starting with the company’s system and historical background, the paper firstly analyzes its existing problems in the progress of project management, for example, systems are not formed in terms of projects’ management methods and the management procedures are not clear; there is a lack of professional talents of project management and most of the current project managers are technicians who lacks the knowledge of project management; the project managers’ rights and responsibilities are relatively light and they are incapable of mobilizing relevant resources, especially core resources; the quality of the purchased important components and parts is not strictly required, with perfunctory supervision and manufacture progress; and the quality problem influence the project progress, etc. Secondly, the paper introduces in detail the research object: the construction project of the garbage-crab-bucket crane of the garbage incineration power plant in D city. By basic tools of project management,such as WBS, progress plan diagram, milestone plan and Gantt chart, the paper carries out the optimal research of those problems of the project’s progress plan. In the part of the project’s progress control, the paper analyzes the main factors which influence the project’s progress and utilizes hierarchical management of the project’s progress, enabling the levels and purpose of the project’s progress control to be clearer and more definite. By utilizing control measures on several links, including design, purchase, construction and commissioning, it isguaranteed that the project can be fulfilled successfully in accordance with the plan and the requirement of the project’s contract is met. It is proved in practice that by utilizing scientific theories and tools of the project progress control, the management level of the construction of the project of the garbage-crab-bucket crane can be enhanced in a further way. The successful implantation of the project achieves the target of a win-win situation of the company’s profits and the customer’s satisfaction, and at the same time provides referential experience for other construction projects of the garbage-crab-bucket crane.
Keywords/Search Tags:Schedule management, refuse crane, WBS, the project schedule optimization
PDF Full Text Request
Related items