Font Size: a A A

The Feasibility Analysis Of The Development Project Of The Elevator Shaft Drawing System Of G Company

Posted on:2016-03-11Degree:MasterType:Thesis
Country:ChinaCandidate:Q L ZengFull Text:PDF
GTID:2272330503953081Subject:Project management
Abstract/Summary:PDF Full Text Request
With the growing market of the elevator, the elevator sales of G company by leaps and bounds, the elevator well road map design workload has subsequently soared. The design staff strength increases, can not quickly respond to customer demand, but also increased the probability of error. The fierce market competition, has made to respond quickly to customer needs become the elevator company’s core competitiveness, and the current domestic labor costs are increasingly rising, with the elevator sales growth, companies considering cost control, could not endlessly increased elevator hoistway drawing design personnel.The design system of the elevator well pattern can only import or import the basic parameters of the elevator, which can quickly generate the elevator well pattern which meets the specifications of the enterprise. The company has implemented a CRM system, which has the elevator parameter in the sales contract, can use CRM in the existing contract parameters as the source data directly into the well road map system, eliminating the design personnel input to the elevator parameters. At the same time, the system can also be built-in check function, the parameters of the elevator for compliance verification, greatly improve the efficiency and accuracy of drawing output. The development of the system of the elevator well pattern which is suitable for the characteristics of their own company is an important technical means and the inevitable development direction of G company to participate in market competition.The purpose of this paper is to demonstrate the feasibility of the development of the elevator shaft system by Gcompany! Will combine G company, the graph of the elevator hoistway design the actual situation, for G company elevator hoistway chart system development project, with project management needs analysis, schedule, quality management, economic benefit analysis, risk analysis, using Gantt chart, network diagram, the critical path, house of quality, DFEMA, dynamic investment payback period, net present value, PFEMA project management tools to project feasibility demonstration of, and ultimately come to the G company elevator hoistway chart system development project feasibility conclusions and recommendations.
Keywords/Search Tags:Elevator, Shaft drawings, System, Feasibility
PDF Full Text Request
Related items