Font Size: a A A

Electromechanical Sub Item Design Management Research Of Redwood Valley Project

Posted on:2016-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y LiFull Text:PDF
GTID:2272330503450321Subject:Project management
Abstract/Summary:PDF Full Text Request
Redwood Valley project positioning for high-end villa, not only has a high requirement on room form, lots, prices and supporting facilities, ecological environment and the pursuit of higher level and the cultural atmosphere. Therefore, the architectural design requirements, especially for higher electromechanical design requirements. The building machine electronic design major in HVAC, plumbing, electrical and civil engineering related, belonging to the functional professional. Because of the "invisible" characteristics, often easy to ignore, affect the relevance and use until it is paid attention to, which will affect the project schedule and quality. This paper will study the overall building machine electronic design management in Redwood Valley project. The main research content through the case design of electromechanical system project analysis, find out the electromechanical design management issues of the project and its solution. The significance of this study is that, through the project case analysis, find out the characteristics of the project and the existing problems; through the value analysis to establish the most suitable machine, electronic criteria the project design; calculation method using professional management, calculate and work out a reasonable and efficient design of mechanical and electrical sub plan and find out the influence of the key work schedule control in order to more easy to grasp, and operating in the implementation process, improve work efficiency, guarantee the quality of work, to meet the project schedule, make a good guidance to the follow-up project.
Keywords/Search Tags:project, electromechanical, design standards, plan
PDF Full Text Request
Related items