Font Size: a A A

Based On The Government.Developers.and Users Run The Multifaceted Kunming For Urban Village Reconstruction Mechanism Research

Posted on:2017-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:L YueFull Text:PDF
GTID:2272330488964341Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Since China’s reform and opening, the process of urbanization continues to accelerate. In recent years, the major cities have carried out renovation and transformation of villages. Kunming launched in 2008 as the transformation of villages within the scope of planning the transformation of the number of up to 382 villages in the country is rare, very representative. From the municipal government issued the first document Reconstruction of the Village "guidance reconstruction reconstruction work" "on accelerating the" Villages on, it indicates that a large-scale transformation of villages in the region began to build the city of Kunming,2013 and plans to stop the transformation is substantially complete.2015, seven years after the implementation of the transformation, the transformation of villages in Kunming is still in trouble ahead.The main problem facing is three. First, the government level, policy mechanisms are inadequate, the actual situation in the blind spot of the transformation policy, no legal basis. Management mechanisms are inadequate, resulting in government departments appeared offside, vacancy, misaligned; second, the developer level, the lack of effective communication mechanism, resulting in the government, developers, and information asymmetry villagers, resulting in a large number of contradictions; s Third, the village level, the depth of participation mechanisms has not been established, the villagers demand channel single cause, to safeguard their own weak, prone to violent conflict. Summary can be seen that the fundamental reason is the lack of a comprehensive transformation of villages feasible to run as a support mechanism.For these reasons, this paper reviews the 2008-situation in 2015 in Kunming city reconstruction and renovation of existing villages operating mechanism, problems; second, through the government, developers, villagers three levels, the use of survey, typical survey, three methods of empirical research, the main city of Kunming, four villages were selected two representatives of each village survey 15 parts, expand the survey. Typical survey mainly in the form of interviews, select government, developers and villagers, represented by tripartite form seven interviews. An Empirical Study of the transformation of urban village representatives were selected yet, the transformation of urban village representatives, representatives of the villages to complete the transformation, the formation of 10 parts of interviews, questionnaires 110 parts, and strive to find the root cause of the problem transformation of villages from different dimensions and depth; the third, related theories, analyze the causes of problems, propose solutions; fourth, respectively, from the government, developers, villagers three levels, establish and improve the operational mechanism of Kunming reconstruction of the Village, the last to do the survey and feedback to revise and improve.
Keywords/Search Tags:Kunming city, Villages, Reconstruction operation mechanism, The government, Developers, The villagers
PDF Full Text Request
Related items