The Cost Control And Management Research On The 5MWP Solar Project In Changtu County Liaoning Province

Posted on:2017-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:Y S WangFull Text:PDF
GTID:2272330485488874Subject:Project management
Abstract/Summary:PDF Full Text Request
Photovoltaic power generation project in our country, more and more important role in the economic construction of energy to overcome the tension of the restriction of the regional economic development, the investment to the construction of new energy projects in our country, the development of new energy photovoltaic power generation project has borne the brunt of the photovoltaic power generation project has developed rapidly in recent years, are increasing year by year. With the development of new energy solar photovoltaic power generation project, project cost control and management of related problems is more and more cause the attention of project managers, many companies are studying how to implement the standardization of the engineering project cost management, in order to improve the efficiency, cost savings. Photovoltaic engineering project cost management is the most important part of photovoltaic power generation project management, the level of project management, directly affects the development of photovoltaic power generation project, it faced with new challenges for electric power construction enterprises.Under this background, the choice of liaoning changtu 5 MWP photovoltaic power generation project cost management will become the preferred for this article research content, main research is how to in changtu photovoltaic power generation project cost management and control, how to changtu photovoltaic power generation project cost management and control of the key factors to adjust; In addition, by means of changtu photovoltaic power generation project cost management and control analysis, find out the existing problems and the solution to the problem, finally achieve the purpose of saving money, for the future construction of similar fisheries photovoltaic engineering cost management and control will play a positive reference.In this paper, the changtu photovoltaic power generation project cost management and control the topic research, mainly is the application of project management related theory, cost control and management of the project research process, application of target cost management, whole process cost management idea, combining changtu photovoltaic power generation project management and practice. This paper studies the main content includes four chapters, concrete research content is as follows:Chapter 1(introduction) from the research background, the middle of the twentieth century, people begin to pay close attention to cost management, it has been formed a relatively mature methods of cost management series. And lists the project cost management research in improving the cost management, improve economic efficiency, to achieve the established goals, within the prescribed period of time to complete the project goals, play the part of demonstration role for cost savings, to strengthen project cost management has a realistic significance. At the same time, described in this paper, research contents, research methods and literature review.Chapter 2 introduces the changtu photovoltaic power generation project general situation of the natural conditions and investment and cost, and discusses in different stages of project cost management problems, for example: the problems existing in the decision-making stage is the project cost management consciousness weak, lack of beforehand control, project management level of personnel quality, management ability is not high; Problems in the process of project construction is changtu photovoltaic power generation project construction standardization level problem, cost control does not reach the designated position, the problems existing in the project cost management system, etc.Chapter 3 analyzes the changtu photovoltaic power generation project cost management problems of reasons, including the formation of these problems have decision-making influence factors of the design phase, such as the decision-making stage only immediate interests, understanding does not reach the designated position, design and construction stages of project cost budget, lack of cost control, etc.; Material procurement price factors in the process of project construction, machinery and equipment used, construction methods such as factor analysis; The analysis of the factors affecting cost management system.Chapter 4 in chapter on detailed analysis of the problems on the basis of each affecting factor, put forward to solve the problem of project cost management and control. Need to develop and upgrade the photovoltaic power generation project cost control consciousness; Need to take the market as the guidance for the whole process of cost control, including the engineering cost calculation, formulate strict terms of the contract, the construction of good credit system, a reasonable design project period, optimization of construction scheme, etc. Need to strengthen the construction of each link cost control, including control of labor, material cost control, control of machinery use fee; In view of the system is imperfect, proposed to establish and improve the changtu photovoltaic power generation project cost control system, including target cost responsibility system, equipment, material bidding procurement system dynamic appraisal system, cost control, project completion settlement and auditing system.Finally, this article proposed the cost management analysis method is applied to the liaoning changtu 5 MWP fishing light complementary power station project, specific analysis and draw relevant Suggestions, photovoltaic power generation project for the future similar engineering cost management will play a positive reference.
Keywords/Search Tags:photovoltaic power, Cost Management, Cost Control
PDF Full Text Request
Related items