| With the high speed development of China’s hydropower project, the cost of hydropower engineering project management has become the focus of the construction enterprise. Influenced by the traditional planned economy management mode, lack of a comprehensive system of hydropower project construction cost control method, a common project budgetary estimate of super estimation, budget, super budget and final accounts over budget phenomenon. In order to improve the competitiveness of hydropower construction enterprise in our country, increase the economic benefits of construction enterprises, establish a complete set of system, to adapt to the hydropower project whole process cost management method, it is very important. project cost management is the core part of project management, throughout the project life cycle, especially now that under the condition of construction tender offer generally low, directly affects the project comprehensive benefit and the construction of project success or failure, for the whole project management plays an important role.Papers in Shouguang sand silted pumping station project as an example, in the framework of project management theory, combining with theoretical analysis and empirical analysis, the method of combining my work, can form a complete set of pumping station of water-saving reform project of cost management, to find the law of the modern project cost management and the management of technology and method, starting from the project cost management, analyzes the cost management system of small hydropower station.This paper is divided into six parts, the first part, first of all, expounds the research background, research significance, then introduces the research situation at home and abroad, finally illustrates the research thinking and technical route of this article. The second part mainly elaborates the related theory of cost management, including the definition of water resources and hydropower engineering project cost management, elaborates the concept, form and content, etc. The third part introduces the Shouguang sand silted pumping station project, including the construction of the background, content and construction quantities, money forecast, economic evaluation, and the necessity, etc. The fourthã€fifth part is the main content of this article, on the cost of pumping station project planning, and the specific cost management and control, found and deficiencies of them, finally put forward the corresponding countermeasures and Suggestions. The sixth part of this article summarizes and puts forward the next step research direction. |