Font Size: a A A

The Construction Of Highway Engineering Project Plan And Control Research

Posted on:2017-05-17Degree:MasterType:Thesis
Country:ChinaCandidate:H J LuoFull Text:PDF
GTID:2272330482491766Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Highway engineering project as a complicated system engineering, its construction process can’t hidebound, according to the characteristics of the project, and other differences and particularity of the construction project, construction scale, construction personnel and mechanical enterprise and flexible management system to operate. To a good end goal realization of highway engineering project, must be scientific highway engineering project implementation plan and carry out effective control of the plan. Guarantee the highway engineering project according to schedule, smooth realization, in order to satisfy the requirement of the contract time limit for a project and the construction unit time limit; Equilibrium configuration of the labor, material, machine, capital and other resources to form water construction order, control the use of each project resource consumption quantity, avoid unnecessary losses, in order to achieve the purpose of control engineering cost; Formulated to ensure the engineering quality and safety measures; To control the purchasing management; Attaches great importance to the engineering change management. To achieve the \ "scientific planning, strict process management, engineering, production safety, environmental protection and efficient saving, increase the economic benefits and save costs\", the purpose of this requires construction companies should be in the production practice continuously review and improve the level of construction management, innovation management methods. Scientific planning, effective control measures, to ensure the smooth realization of the construction of the project objectives, to ensure that the highway engineering to maximize economic and social benefits.This paper aimed at the main control all aspects of project management content and method made a general introduction, and then to SZ project in the implementation of SZ department of highway engineering project specific construction process, analyzes the SZ project in the project plan and control department management problems in all aspects, and the problems existed in item by item analysis, put forward the solutions. Then rose to the height of the theory mainly from the perspective of feasibility, applicability, analysis of the highway project under the condition of the demolition resettlement is not complete, the progress of the project implementation stage, resource balance, cost, quality, safety, procurement, seven aspects such as the change of main control content and method and measures especially enrich the highway engineering construction management method. By local adjusting the construction sequence, improving construction technology and measures of the construction methods of innovation, so as to optimize the all aspects of the construction management and adjustment, ensure the smooth realization of the overall goal of road engineering project.This article has a distinct pertinence, strong operability. Of highway engineering construction personnel, therefore, more detailed understanding of the highway engineering project management content, guide the personnel engaged in highway engineering construction work smoothly, with good quality, the overall objective of ensuring the completion of the contract, has great reference value.
Keywords/Search Tags:Highway engineering construction, schedule and control, resource planning and balanced
PDF Full Text Request
Related items