Yantai Doosan Machine Training Center Construction Project Quality Management Research

Posted on:2016-07-07Degree:MasterType:Thesis
Country:ChinaCandidate:B WangFull Text:PDF
GTID:2272330482464830Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction industry has always been one of the most important industries in China. The current construction quality issue become more prominent.The quality of the building is not only about the applicability of the project, but also with people’s lives and property are closely related. So during project management, engineer quality control must be kept in the first.At first the paper clarifies the background and significance of the topic.Pointing out the necessity of studying the quality of project. Combined with domestic and foreign literature of project quality management proposes the method of this case.At first, the paper illustrates the background and significance of the selected topic, points out the necessity of the present study to ensure the engineering quality, and combined with domestic and foreign relevant literature presents the PDCA method and main content this case studies using. On the basis of the theoretical and methods this paper expresses the shortage and innovation point. And combining with the three main factors of engineering quality management:project quality planning, quality assurance and quality control, this paper explains the concept and theory on the basis of practical engineering from case connotation and methods of quality management and suggests should pay attention to details and elements in the process of quality management. Thus the paper puts forward the following important aspects: Quality first; Project quality planning method should be case by case; Ensure the quality to guarantee system and management responsibility system; Quality control throughout the project construction has always been.The main research method of the article is PDCA, at the same time using a variety of other methods in different stages. In the planning stage, using WBS and Matrix method; in the assurance stages, establishes the quality assurance mechanism and puts forward some measures for quality assurance; in quality control stages, using statistical method, the sampling method of flow chart, fish bone diagram and histogram method; finally put forward some engineering measures.The methodology of science is the premise and foundation of theory to protect the engineering quality. Case by case on the different construction units and construction sites. Finding in line with the problems from the actual method can achieve the perfect combination of practical and theoreticalFinally the paper puts forward that the engineering quality problem must be people first, and coordinate the harmony of people and nature, people and buildings, nature and building. When the person’s experience is comfortable and healthy, and the building use function have reached, we can say the building is people oriented. Secondly combined with material, legal, environmental and other aspects as management coordination, the successful management has get twice the result with half the effort. Then we combine the specific methodology so as to achieve the engineering quality of optimization. Scientific construction, scientific management and methodology is necessary to safeguard the quality of engineering factors...
Keywords/Search Tags:Training centar, Project, Quality control
PDF Full Text Request
Related items