Font Size: a A A

Suitability Study Of Housing Construction Facilities Along The Highway Using Groundwater Source Heat Pump

Posted on:2016-04-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y L ZhangFull Text:PDF
GTID:2272330479997381Subject:Heating, Gas Supply, Ventilation and Air Conditioning Engineering
Abstract/Summary:PDF Full Text Request
In recent years, with the rapid development of Chinese economy, Chinese highway also achieve leapfrog development, the total highway mileage reached eight miles, ranking second in the world. With the increasing number of traffic mileage, heating and air conditioning system, the total installed capacity of its management and service sites is also increasing. Through research we found along the highway mainstream form of housing construction facilities for heating and air conditioning system, high pollution, high energy consumption of coal-fired boiler plus air-conditioning. Under the trend of energy saving, energy issues along the highway construction site housing facilities are increasingly being seriously, this is a groundwater source heat pump energy-saving technology to provide the promotion and application of housing construction along the highway Shi the foundation.This paper describes the technical characteristics of the groundwater source heat pump technology in its application should pay attention to what issues do a simple overview. Through the actual research of sites along the highway, for its energy along the highway, environmental characteristics have a preliminary understanding, based on survey data is to build a highway along the process of housing construction in the load calculation of internal disturbance model. Then further along the highway to the architectural characteristics of housing construction facilities, energy use characteristics, load characteristics, the characteristics of the outdoor environment and groundwater analysis hydrogeological conditions described characteristics. Heating and air conditioning systems obtained housing construction facilities along the highway is the diversity of choice, suitable for heating and air conditioning systems at different sites are different. GWHP as one of choice is not the most appropriate? To evaluate the suitability of GWHP.For this purpose according to housing construction facilities along the highway construction characteristics and features across climatic zones, select internal type of built-up areas, groundwater source heat pump, multi-line and coal-fired boiler plus three kinds of split air-conditioning systems to economic and social Benefits for evaluation using multi-objective evaluation methods to determine the different irrigation pumping groundwater source heat pump system than in the case of different types of decisions suitability.
Keywords/Search Tags:Highway, housing construction facilities, GWHP, suitability
PDF Full Text Request
Related items