Font Size: a A A

The Quality Management Of Teachers Apartment Construction Project Of Shenyang Institute Of Engineering

Posted on:2016-02-10Degree:MasterType:Thesis
Country:ChinaCandidate:S J ZhuangFull Text:PDF
GTID:2272330467497882Subject:Project management
Abstract/Summary:PDF Full Text Request
Construction projects quality is related to the people’s lives and safety ofproperty. And construction projects quality is not only directly related to the qualityof learning and the quality of life of teachers and students, but also it is closelyrelated to the economic benefits of the school and communityThe first chapter introduces the basic information of Shenyang Institute ofEngineering teacher apartment buildings, architectural design specifications, thespecific environment of project quality management. And it analyzes features ofShenyang Institute of Engineering Teacher Apartment Project. What’s more, it alsoanalyzes the main factors affecting the quality of the project. The main factorscontain environmental factors, human factors, materials factors, mechanical factors,methods factors. Finally, the first chapter analyzes the meaning and significance ofresearching management quality issues.The second chapter analyzes the factors affecting the project quality issues ofShenyang Institute of Engineering teacher apartment buildings. Although theproject has taken the appropriate quality control measures, but it still showed moreproblems: lower educated workers, poor sense of responsibility; material quality notmeeting the design requirements, storage of materials not meeting specifications,materials testing not timely; low efficiency of machinery and equipment, outdatedequipment, new equipment using lowly; lack of innovation in construction methodsand so on. More still, in this chapter, it analyzes many factors what affect to thequality of the project, such as people, materials, machinery, project management and supervision and so on.The third chapter describes the quality control measures to the project ofShenyang Institute of Engineering Teacher Apartment. Firstly, it introduces theobjectives of the project quality that is Shenyang Construction Engineering QualityAward. Combining with the main factors affecting the project quality, it puts forwardto the quality control measures for this project: instituting sound construction teamand organization configuration and construction system; relying on advancedconstruction methods and technology to improve the quality of projects; takingeconomic reward and punishment measures to ensure project quality, while doingbetter to the operation and acceptance of construction machinery and equipment.Secondly, in order to prevent the emergence of common quality problems, in thissection, it describes the quality control measures for major projects division, such asquality control measures of the building body and infrastructure, qualitymanagement measures of supporting projects and so on. Finally, it describes thequality management measures for mainly sub-project: masonry works qualitymanagement measures, reinforced concrete works quality management measures,roofing and exterior walls waterproofing works quality management measures, thefloor and ground works quality management measures, interior and exteriorplastering and ceiling plaster works quality management measures.The fourth chapter describes safeguards what implement project qualitymanagement measures of Shenyang Institute of Engineering teacher apartment. Inorder to protect the Shenyang Institute of Engineering teachers apartment projectsmoothly implementing, achieve objectives of project quality management andmaking the overall quality of the project to achieve excellent standards, makeadequate preparations from all aspects of security, systems, people, funding andorganization for the project that makes success for carrying out the project and lays a solid foundation for achieving the goals.After the above analyzing, this article makes a conclusion ultimately that thequality of the project is the most important of project management. Only goodquality projects can fully realize its value. To ensure the quality of a project’sobjectives well realized, we must have clear quality goals and establish good qualitymanagement institutions. And eventually form a complete quality assurance system.
Keywords/Search Tags:Teachers apartment, Quality management, Sub-project, Security system
PDF Full Text Request
Related items