Font Size: a A A

Reserch On Information Management Of Power Plant Construction Under EPC Mode

Posted on:2015-07-07Degree:MasterType:Thesis
Country:ChinaCandidate:W XiongFull Text:PDF
GTID:2272330467495249Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The EPC general contract mode is a kind of engineering construction mode generally implemented in international projects, which has been applied and promoted in domestic large-scale power plant project. Positive promotion of the EPC mode would be helpful to improve enterprises’ competitiveness in power plant projects’ construction, to accelerate the process of engagement with international power engineering company management mode.Currently, the information construction in power engineering construction industry is developing faster, promotion of information technique are focused by each companies, in order to improve management. Those enterprises, of which the business area is power plant construction under EPC mode, are discussing methods about how to improve management levels by application of information technology. However, no existed methods of information technology could be implemented currently.This paper stands at the point of enterprises’management of power plant project construction under EPC mode, management of information technology for EPC projects is illustrated. By reference checking and situations investigation, features of information management of EPC mode for power plant construction and situation of information construction for EPC enterprises are analyzed. Consequently, a comparatively complete solution is concluded for information management in such projects.This paper is divided into six chapters:The first chapter illustrates background and significance, power plants of EPC mode are introduced, significance of information technology management and the corresponding situation of domestic and foreign areas are analyzed; The second chapter introduces analysis of the key points of information technology management for EPC projects, including features of projects and information, measures of information division, situations and problems of power plant construction under EPC mode in China is also illustrated in this chapter; in the third chapter, the integral design frame of information technology management is proposed by introduction of theoretical research and examples analysis; scheme design of function module is proposed for information system In the fourth chapter; the realization of information plan and efficiency of application are illustrated the fifth chapter; the summary of this thesis in six. Chapter.
Keywords/Search Tags:power Plant Construction, EPC general contract, information, information management
PDF Full Text Request
Related items