Font Size: a A A

The Interface Management For Engineering Construction Projects

Posted on:2015-06-02Degree:MasterType:Thesis
Country:ChinaCandidate:F DaiFull Text:PDF
GTID:2272330452970180Subject:Project management
Abstract/Summary:PDF Full Text Request
Accompanied by the development of the social economy, a variety ofengineering construction projects grow more and more quickly. These projects inaddition to more and more in number, scale is more and more big, the technology ismore and more complex, involving areas more and more, function more and morecomplete, more and more contractors. As a construction engineering projectmanagement, how to coordinate the relevant technology, manpower and materialresources, financial resources, information, land, energy and other resources for theproject construction services, in order to better control the engineering constructionproject quality, safety, schedule and cost, is important and urgent task in front of us.This needs us to emancipate the mind, advancing with The Times, blaze new trails, toproject management related theories and methods constantly in-depth study and full,Refinement of refinement, so as to promote the project management. The interfacemanagement principle for engineering construction projects in this context came intobeing.This article according to relevant data and related research achievements of studysummarized, on the basis of further analysis by refining, first of all, the relevantdefinition of interface and interface management, define the object of study forconstruction projects of interface management. Secondly in engineering constructionprojects of the root causes of interface is analyzed, for the whole life cycle ofconstruction projects, dynamic interface management theory foreshadowing. Again todivide and required to comply with the principles of interface, for scientific,reasonable and efficient interface management to lay a good foundation. And dynamiccontrol of interface management system architecture, interface, interface riskprediction, crisis plans, the interface of network information integration and explainseveral interface management measures and so on, and combining theory withpractice, emphasize the enforceability and operability of each measures. Then this textwill each stage of construction projects, interface state identification analysis andaccording to their respective characteristics at different stages of focus and theapplicable interface management measures. At the end of the paper to a productionfacilities construction for offshore oil field as an example, the paper analyzes the current situation of the interface management for engineering construction projects atpresent stage and interface management theory combined with the practicalsignificance to guide the engineering construction project practice.This essay is based on the current project management theory can’t keep up withactual engineering construction project practice, put forward by the creative advance atheoretical exploration engineering construction project management refinement,related content also need through specific engineering practice to constantly enrichand perfect.
Keywords/Search Tags:construction projects, the interface management, dynamic control, risk prediction, information integration
PDF Full Text Request
Related items