Font Size: a A A

Study On Host Island Developing Control Of XXXX Power Station Engineering Of India

Posted on:2015-03-29Degree:MasterType:Thesis
Country:ChinaCandidate:C Y HanFull Text:PDF
GTID:2272330452461060Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the development of science and technology, the size of projectconstructing is getting larger and has higher technical quality and systematization,which means higher complication. Especially in recent years, the single installedcapacity of the thermal power construction projects has been improving over time.Both domestic and foreign scholars and the general contracting companies areresearching the control and implementation of the power engineering procurementconstruction (EPC) projects, from which they obtained lots of experience. In theprogress of the implementation of domestic EPC, a solid base of the control systemsof the general contracting companies are constructed through the practice andconduction of the national standards and rules. However, when implementing of thissystem in overseas projects, the effects of this system are extremely limited due tothe impacts of abroad engineering practices, years of the convention of local owners,the restrictions of laws and other factors from society, politics, finance, culture,human geography, manners and customs, as well as the factors of the commitmentand comprehension of the business owner.Under a deep analysis about the scope, characteristics and standard of XXXXPower Station Engineering of India, this paper makes a main line from three aspectsof quality, schedule and cost, finds out the features and difficulties in projectimplementation by taking design, procurement, production, delivery, installationguide, debugging guide, risk analysis and budget management as research objects.By using nine general theories of project management system-quality from PMI, acontrol program is constructed from quality, schedule, and cost. Finally, through theconcrete measures to ensure the implementation of the scheme and the project, andprimarily realized the goal of the project after the supply, the project has received agood effect.
Keywords/Search Tags:quality control, schedule control, cost control, project management
PDF Full Text Request
Related items