Font Size: a A A

Study On The Construction And Anagement Of The Project SR

Posted on:2015-09-25Degree:MasterType:Thesis
Country:ChinaCandidate:D L LiuFull Text:PDF
GTID:2272330431995112Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of economy and society,in economic activities,the project hasbecome a core strength to promote economic development. The SR project which chargedby A,as a joint venture by the D Government and YT Company Limited,including theconstruction of the project design units,construction units,construction units,the use ofunits,and other multi-participation subject. Due to all causes since the project started in2008has yet to be completed. Due to schedule delays,design errors,and use of equipmentsuch as parameter uncertainty causes many problems still unresolved. Therefore,this articlehopes to combine specific projects to project management theory analysis of specific issuesthat exist in the construction,and then continue to enrich the theoretical and empiricalresearch that combines theory and practice of closer, more scientific later, whileaccelerating and making the process of SR project.SR project for the study,the use of empirical research and case study analysis, themain contents of five parts: First,analyze current research from construction projects andproject management in two parts,focuses on the research results of domestic projectmanagement, research ideas and future trends through research status and give academicevaluation. Second,introduce the basic theory of project management,including projectmanagement basic theory,basic theory of project management,project management modebasic theory and basic theory of project management system. Third,SR project overviewand management of the main construction schedule,management status and existingproblems,the problem mainly for project construction program is unreasonable,inadequatecontrol project progress, Participation main level is not high and construction fundsgreater gap and so on. Fourth,for SR project management issues,SR project managementmodel for optimization: create top-level decision-making and oversight mechanisms tocommunicate,to build the entire project schedule control management mechanisms,reconstruction projects Participation body management,establish and improve the projectmanagement organization mechanism, establish a strict and clear enforcementmechanisms. Fifth, to provide safeguards for the SR project management modeloptimization,focus on providing high-level recommendations in terms of decision-makingand project execution and funding so as to ensure the SR and allow the smooth progress ofthe construction of the project,after four powerful propulsion plant in SR project and makerapid and efficient manner.
Keywords/Search Tags:project management, construction project, management model, projectmanagement
PDF Full Text Request
Related items