Abstract/Summary:PDF Full Text Request
Under the background of the atmospheric environment is getting worse in our country, coal-fired power plants industrial development limited, the key areas has banned the construction in addition to cogeneration unit in coal fired power plant. In order to adapt to the economic development of the need for power, thermal energy, and vigorously carry out preparatory work for burning thermal power project, strategic reserve some cogeneration project is very necessary.At present, the industry of the earlier work management coal-fired thermal power project has not been studied, nor the formation of mature management system and specialized management method, which is mainly due to the different period, different requirements for coal-fired thermal power project construction in different. In this paper, taking Dayawan power the two phase of the project as a case, to analyze and discuss the problems of coal-fired thermal power project management work and the process, proposed the constructive opinion, seek common points early management work of coal power project, enhance the applicability of the industry.Firstly, Dayawan thermal power the two phase of the project area’s electricity and heat load, as well as the necessity of the construction of this project; management by objectives (MBO) concept, and introduced in detail; analysis of China’s coal-fired thermal power project approval and content of work requirements; with the actual working condition of many policies and regulations to analyze the problem of finding and solving; project preparatory work on the target management loopholes, using scientific methods and innovation to make up for the lack of work and progress of the harsh requirements.Through years of management industry research system related documents, understanding and policy reform and changes in the course of development of the industry for many years; collection, extract relevant data, adopt the method of combination of qualitative and quantitative analysis; according to the personal practice and experience on the paper, with the eyes of development are discussed, at the same time, learn and absorb the advanced management experience, combined with the characteristics of Dayawan thermoelectric two projects, studies the application of target management in previous work, problems and solutions. On the theory of management by objectives, launches the discussion and the research and application of innovative ideas, risk management and the overall management in the preparatory work of Dayawan thermoelectric two phase of the project, proposed solutions to problems, professional research and evaluation of the industry work practices contribute to later, will help to further improve the level of management of coal-fired thermal power industry early.
Keywords/Search Tags:Management by objectives, Dayawan thermal power project, Application Research
PDF Full Text Request
Related items