Font Size: a A A

The Research On Quartz Photomask Project Development And Control Research

Posted on:2013-02-08Degree:MasterType:Thesis
Country:ChinaCandidate:J WangFull Text:PDF
GTID:2269330425960146Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the country flat-panel display industries and TFT-LCD lists as the11th "five-year plan", and the medium and long-term prioritize industry in2020. The high generation’s TFT-LCD production line starts to construct or to enter the plan. Simultaneously, the country also started the material, the component and the correlation technique of plan. Thus, it promoted the quartz photomask, particularly great size quartz photomask in the TFT-LCD panel display profession’s application. The market of demand also rapidly increases.The ominisun material Limited company construct the first great size soda photomask production line in domestic in2005.In domestic it also has certain influence. But as a result to the market underestimate, the soda photomask market of space was relatively small, the profit of space is not big. The company’s the state of operation was not good for4years.To change this passive aspect, after it fully investigate and study the market, and consided the profession experience and the technical accumulation on photomask for4years, the group decided to expands a6-8TFT quartz photomask project to grab the high-end market, in the best opportunity which the country supports vigorously to the information industries policy. It will enable the company to realize management turning losses into profit.The article introduced the domestic and foreign project management research’s history and the present situation, reviewed the project management theory main development phase as well as the various stages main theory. The project management theory developing process may includ:Nine big areas of knowledge, project management primary coverage, plan stage and implementation stage primary coverage.The project implementation was divided the project design and the control two stages.The design stage has carried on the plan design according to eleven steps to the project. The plan design divided into the general goals formulation, the organizational structure, the milestone plan, the work structure to decompose (WBS), the responsibility assignment matrix, the human resources plan, the cost to decompose, the project progress arrangement, the cost analysis, the project implementation risk. The project design guarantees the implementation process to be able the better control cost, and completed each task according to the progress request. It regard design proposal’s in some committed steps and the relation implementation’s concrete case, the implementation stage has given exhaustive showing.Also unified in the article, the implementation stage applies the operation management, human resources management, the lean manufacture, the quality control, the supply chain management, the strategic management and so on correlation theories. And the partial quote from the bibliography was given the footnote annotation, it has manifested the method which fully the theory and the practice unify.
Keywords/Search Tags:Quartz photomask, Project Management, WBS, Gantt Chart, Resourcesexpense S diagram of curves
PDF Full Text Request
Related items