| With the rapid development of communication services and operator of full serviceoperation, communications industry increasing competitive pressure, reducing networkmaintenance costs, improve network operation quality, communication networkmaintenance network maintenance an important part of research communication networkmaintenance mode under the new situation has extensive and of great significance.This analysis of the communications industry through the network on behalf ofVictoria State, contains the item dimensions, contents, structure and cost estimates,currently part of this decentralized, professional networking d mode, universal problemanalysis and summary, this article specifically to mobile networks in Shaoyang on behalfof dimensional model for the study, in-depth analysis of Shaoyang, move thecurrent-generation dimension patterns, This article specifically to Shaoyang mobilenetwork maintenance mode for the study, an in-depth analysis of Shaoyang move currentmaintenance mode, through risk assessment for current maintenance project, come toShaoyang move three key risks for the current maintenance mode: gross margin risk,labor risk and injury risk. For Shaoyang move discussion and resolution of existingproblems and risks in maintenance mode, presented integrated maintenance mode ofthinking.Integrated maintenance mode refers to the region as a unit, shifted the formerdecentralized and professional maintenance comprehensive maintenance by amaintenance unit. Compared with the primary dimension model, integrated integratedintegrated maintenance mode maintenance resources, increasing economies of scale,specifications, maintenance work and after the fusion of the whole business of adaptingdevelopment needs to have greater advantages, such as, combined with ITinformationmanagement tools such as dispatching system, GIS systems, the application of theintegrated resource management system, strengthen scientific management andassessment of the integrated maintenance mode, Adopted by the end of this article in thepilot reform of maintenance of Shaoyang xinningxian marketing integration, reflects thepattern in the savings in maintenance costs and increased management efficiencyadvantages. |