Font Size: a A A

Based On Data Integrated Treatment For The Remote Power Management System

Posted on:2014-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:W Q ChenFull Text:PDF
GTID:2268330401467175Subject:Software engineering
Abstract/Summary:PDF Full Text Request
As with our country economy high speed development enterprise powerconsumption is in rapid growth, QieDian, breach of contract of electricity, illegalaccidents more and more, the amount is more and more big and QieDian means alsomore and more concealed, maintaining the lawful rights and interests of the powersupply enterprise is imminent. So the power department needs timely, accurately graspthe user’s electricity situation, completes the real-time monitoring and inspection toprevent the user QieDian, default electricity the happening of the circumstance timelyunited electricity to reduce enterprise’s economic loss. And based on data integratedtreatment of the remote power management system for the emergence of electric powerproduction, scientific management, create conditions. At present, the domestic someprovinces and cities and the domain expert has already begun to remote monitoringdirection of the research, from material shows that they also is only to the usermeasuring point data acquisition research, and lack of acquisition back data automaticcomprehensive comparison, the condition decision, automatic alarm functionsaccording to the result. As the electric power Marketing Department for electricinspection requirements gradually improved, the electricity supply to users of onlinemonitoring demand also increasingly prominent, online monitoring of the systematicand comprehensive will replace the current local research.This research topic of construction based on data integrated treatment of the remotepower management system is a set of realize the already acquisition back to user fieldpower data, carries on the comparison and analysis of the results, abnormal alarmfunctions of automation management system. The system will change the past powerinspection personnel to the scene manual inspection mode, can greatly reduce theworkload of electricity inspection personnel, also will allow electricity inspectionpersonnel to the user the power of the real time control of the situation, realize powercheck real-time, automation management. Through the construction of remote powerinspection system can replace the artificial cycle check management mode; At the sametime, to realize the user’s electricity supply of on-line monitoring, to the user’s illegal conduct real-time inspection.
Keywords/Search Tags:Remote electricity management system, Server2000database, GSM/CDMAwireless network
PDF Full Text Request
Related items