Font Size: a A A

The Reserch And Development Of Financial Report Management System Of Shandong Energy Group Co., Ltd

Posted on:2013-05-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z D YuFull Text:PDF
GTID:2268330392970926Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Shandong Energy Group Co., Ltd was set up by reorganizing6companies,approved by the Shandong provincial party committee and provincial government.The6companies are Xinwen Mining Group Co., Ltd, Zaozhuang Mining Group Co.,Ltd, Zibo Mining Group Co., Ltd, Feicheng Mining Group Co., Ltd, Linyi MiningGroup Co., Ltd, and Longkou Mining Group Co., Ltd.After the formation of Shandong Energy Group Co., Ltd, there exited someproblems. Because of the different financial report management systems of the6companies, the statement forms and the details were different. And the financialreports, instead of being automatically generated, they were artificially filled. Thisresulted in the inaccuracy of the reports and the difficulty for the head office tosummarize and analyze the information. However the abolition of the old reportsystems and reconstruction was not a wise choice. Two of the six units were using UFfinancial accounting system and the others were using Wave financial accountingsystem. The companies had put into much manpower and material resources andaccumulated large amounts of financial data. So the abolition of the systems wouldlead to resource wasting and the cost of large amount of manpower for the conversionof the financial data format.Therefore, in order to ensure both of the summary, statistics and analysis for theEnergy, and the continued operation of the original financial accounting systems forthe6units, the FA department of the Energy decided to set up a centralized financialreport system after sufficient surveys and analysis. This system would unify thefinancial report system platform, unify the statement forms, make use of the data fromthe existing accounting systems of the6units, improve the efficiency for producingfinancial reports and ensure the accuracy of the reporting information. In this way, theEnergy Group can get the accounting information of the6units in hand timely andprecisely, and strengthen the financial supervision.The centralized financial report management system for Shandong Energy GroupCo., Ltd emerged because of the difficulty in financial management after thereorganization and the imperative need for a new financial report management systemto solve these problems. The centralized financial report management system forShandong Energy Group Co., Ltd was developed based on J2EE tiered enterprise application architecture and component-based Development. It adopted theapplication deployment of B/S structure and browser-based operation. And the systemsupports the financial report management systems of a variety of databases.This thesis does a detailed description about the system functional requirementanalysis, the system design and the system implementation of the centralized financialreport management system for Shandong Energy Group Co., Ltd.
Keywords/Search Tags:Financial Report Management System, J2EE Architecture, B/SStructure, Component-based Development
PDF Full Text Request
Related items