Font Size: a A A

Analysis On Large Scale Engineering Project Quality Management And Control Method

Posted on:2014-08-12Degree:MasterType:Thesis
Country:ChinaCandidate:P J DuanFull Text:PDF
GTID:2252330428479089Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Major projects due to the complexity of the project itself, as well as numerous management, resulting in existing large-scale construction engineering quality supervision in China cannot meet the needs of construction, and past research, more is just stuck in the empirical analysis of theoretical study on the lack of effective. In view of this, this article’s summary of the system quality management based on the theory of, against our current construction quality management of large construction in the area of quality awareness is not strong, poor quality plans are not clear, quality assurance, engineering quality diseases cannot be cured, and other problems around the preparation of quality plan, quality assurance system and study on how to carry out quality control system. In quality plans work in the preliminary introduced has6Sigma quality management method, effective to uses has supervision of resources advantage, will supervision units of oversight management functions and construction enterprise of self control organic of combined up, to project parameter built parties main-as a system, using target management method, highlight quality plans of advance control, will set quality points, and strengthened processes quality control as quality management work of focus, in actual of management work in the has must of reference role and actual application value. And through the analytic hierarchy with as well as the fuzzy quality synthetic evaluation and other mathematical models, before proposed confirms to the validity of quality control and control method that with the aid of the mathematical model, and carried on the analysis and demonstration to the simulation result, confirmed and appraises the accuracy and validity of the big-scale work project quality control and control method that this research institute proposed. The guarantee has certain reference function and practical application value in the actual supervisory work. Full text in theory based research based, through actual case (Shanghai global financial center) research, through six sigma in quality plans in the of introduced, that defines, and measurement, and analysis and improved in quality plans in the of application, while to QC thought for based from people, and material, and machine, and law, and ring five large elements of control quality analysis, and through levels analysis and fuzzy integrated evaluation, mathematics method, proved has this research of effectiveness and practicality. While final project completion from the Shanghai world financial centre, quality management, its overall effect is satisfactory, further enhanced the construction progress at the same time, guarantee the quality of the entire project, and also reduces construction costs, it is not anticipated by prior. It also means, new ways of controlling system and improvement, and for overall optimization of the project was a huge success, is adopted and implemented in the process of construction of enterprise in the future.
Keywords/Search Tags:Large scale engineering project, Quality management, Six Sigma, QC thought
PDF Full Text Request
Related items