Font Size: a A A

Research On Budgetary Estimate Control Of Engineering Project

Posted on:2014-04-09Degree:MasterType:Thesis
Country:ChinaCandidate:C C ChenFull Text:PDF
GTID:2252330425985538Subject:Project management
Abstract/Summary:PDF Full Text Request
At present, In China, most projects will vary over budget estimates, budget exceeding budgetary estimate, super-budget accounts for the "super three" phenomenon. Exceeds the budgetary estimate to not only make the project investment benefit decreased, and leading the country seriously out of control on infrastructure investment, more importantly, it is related to people’s perception of the credibility of the government, therefore, study on government investment project shall exceeds the budgetary estimate problems, and puts forward the corresponding solutions and countermeasures is very necessary and meaningful.The studio for government investment projects shall exceed the subject issues, work can be summarized as following1. Through the basic theory on design budgetary estimate and budget for the design review, the reference and inspiration to the project cost management of our country on research, provides the theoretical basis of over budget.2. Through the research of cost control theory research of project design stage and combined with the actual situation, the design stage, especially the preliminary design phase of the project investment is the largest, therefore, cost management in the whole process of engineering project, the key is to manage the design stage, can really play the role of cost management. For the study of over budget issues provides a starting point and key range.3. Reason analysis and research project shall exceed the problem, that the subjective reason occupies a large proportion in the causes of super probability problem, is the main reason.4. Through the analysis and research of Wenzhou municipal Party school, super practical case almost, the cause of government investment projects shall exceed phenomenon, and put forward the measures and Countermeasures of government investment project cost control suggestions.Study on government investment project shall exceed reason for future research on control method of cost, provides the preliminary research, and lay a solid foundation.
Keywords/Search Tags:Preliminary estimate, Budgetary estimate of design review, Cost control, Exceeds the budgetary estimate
PDF Full Text Request
Related items