Font Size: a A A

Study On Construction Technology Of Bridge Integrated Deck Of Prefabricated Box Girder Bridge

Posted on:2014-10-11Degree:MasterType:Thesis
Country:ChinaCandidate:C C YanFull Text:PDF
GTID:2252330422461231Subject:Bridge and tunnel project
Abstract/Summary:PDF Full Text Request
The whole bridge integrated deck has a reinforcing effect on the old bridge, how todetermine the reasonable construction technology that the entire deck of the old bridge isbeneficial in good condition, to provide safe and comfortable driving condition forreinforcement,improve the durability of bridge and extend the service life. Discuss theintegrated construction technology reasonable, provide the basis for the whole applicationdeck in the bridge construction.This paper based on the "Lantian to Shang Zhou expressway" research project,according to the construction technology of integrated deck are discussed. First of all, thepaper explores the construction process of the deck elevation, and pipe network installation,bridge deck, flatness control and joint treatmentand put forward the correspondingcountermeasures; and then, according to the characteristics of the whole deck, integrated deckof concrete materials required and the basic request, analysis and contrast the design methodis different, the mixture ratio design example of reasonable formulation of integrated deck ofconcrete, ensure the effective connection of the process design of whole deck and base deck;finally, in accordance with the overall deck construction technology characteristics andconstruction machinery matching principle, on the performance of different leadingmachinery and applicability has carried on the contrast analysis, ultimately determine theoverall layer supporting machinery and mechanical construction scheme.Through this analysis and study, the whole deck of concrete mix design should bechosen as the controlling index and design method according to its characteristic; integrateddeck and girder must take the combination of reliable; should adopt the appropriate pavingmachinery and construction technology, to ensure the construction quality of the whole deck.Integrated deck is applied in the “Lantian to Shang Zhou expressway”, after that, workingtogether with the main performance of the whole deck of good performance, ride comfort isimproved obviously, after using integrated deck construction technology in prefabricated boxgirder bridge deck reinforcement in the repair and provides reference.
Keywords/Search Tags:Bridge Integrated Deck, Construction Technology, Concrete, Design of MixProportion, Mechanized Construction
PDF Full Text Request
Related items