| An auto Sales Service Co belonging to the Shandong automobile trade group.Construction project of car repair service center is located in Shandong County in themarketing of West Road and Wen River Road Interchange northwest corner, a total areaof96200m2. Plans to invest two hundred million yuan, the planning and construction of9car4S stores, fine decoration, insurance certificate, second-hand car trading, spareparts warehousing, worker life supporting the project, construction area of116400m2,to take a one-time planning and step-by-step implementation of the scheme, theconstruction period of2years. The project completed and put into operation, theestimated annual sales income reached750000000yuan,5000000yuan in profits andtaxes. Years of operation of2880hours,360days.This is a new construction project, according to the "law" PRC EnvironmentalImpact Assessment and the "construction project environmental protection managementregulations"(State Council Decree No.253rd) regulations, the projects require anenvironmental impact assessment, from environmental protection angle argument of theexistence of the project’s environmental problems, puts forward the strategies andmeasures to prevent or reduce the maximum the pollution of the environment. In thisstudy, actively cooperate with and assist the construction units, the construction projectsite survey, the project site and surrounding area, meteorological, hydrological andpollution of the society conducted a survey analysis, and collect the information aboutthe domestic and foreign similar project, based on information provided in the data onconstruction projects and construction units are analyzed in detail. Last, according to therelevant state construction project environmental impact assessment regulations andtechnical specification, analysis and evaluation of the impact of construction projects onthe environment of.The results show that: the construction project conforms to the national industrialpolicy; site selection is reasonable, the project put into operation, wastewater, exhaustnoise emission standards, the effective disposal of solid waste; total amount controldischarge of pollutants meet the project; the project meet the health protection distancerequirements, within the scope of influence of each pollutant to the environment can bein the local environment to bear; evaluation of district public support in the construction of the project; therefore, from an environmental point of view, the car sales ServicesLimited car sales repair service center construction project is feasible. |