Font Size: a A A

Research Projects In The Oil To Gas Furnace After Evaluation Of Qinhuangdao Shougang Plate Limited Corporation

Posted on:2014-11-21Degree:MasterType:Thesis
Country:ChinaCandidate:X F PuFull Text:PDF
GTID:2251330392964339Subject:Project management
Abstract/Summary:PDF Full Text Request
Heating furnace combustion gas project is modified coal tar oil heating furnace, intoburning natural gas heating furnace engineering. Taking qinhuangdao shougang plate co.,LTD., furnace oil to gas after the project evaluation and gas consumption indicatorsbenefit as the research object, the reference after project evaluation theory and practiceexperience at home and abroad, mainly adopts survey statistics, comparative analysis,combining qualitative research and quantitative analysis methods of heating furnace to qinplate company to evaluate oil gas project management and operations research, late in theproject to improve operations and make the project to achieve the best operation effectFirst of all, this paper expounds the background of the topic selection and researchsignificance, as well as the project evaluation research status at home and abroad havebeen summarized and the development of the theory summary.Secondly, after introducing the project assessment basic theory, introduced the basicconcept of project evaluation, expounds the content and characteristics of the projectassessment after, after the evaluation index system of the basic steps and, after projectassessment after the general principle and assessment method.Again, this paper summarizes the qin plate heating furnace oil to gas company projectimplementation basic situation, including the implementation of the project progress andcompletion. On this basis, oil to gas heating furnace of qin plate company projectconstruction and operation management are analyzed and evaluation, the economicbenefits of operation about this project, environmental impact and social benefits areanalyzed in detailed and in-depth, comparing to the project schedule and the actual effectanalysis, find out on the problems existing in the construction and operation of this projectand target deviation, and analyzes its causes. Project operation management during theprocess of analysis, through the data analysis, analyzed the influence of relationshipbetween gas consumption indicators and other indicators, and put forward to increasefurnace operation comprehensive economic benefit index management concept.Finally, in the qin dynasty plate company heating oil to gas after the whole projectmanagement process assessment, based on the proposed project operation management measures need to be improved, points out the project operation period may need to payclose attention to factors affecting the economic benefits, in order to achieve the goal ofimproving investment comprehensive economic benefits.
Keywords/Search Tags:coal tar to natural gas, gas consumption indicators, project evaluation, product quality, weight gain or loss
PDF Full Text Request
Related items