Research On Guarantee Strategy Of Optical Fiber Transmission Network Project For Sichuan Mobile

Posted on:2014-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:C HouFull Text:PDF
GTID:2249330398976253Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the popularity of smart phones and mobile Internet business, brought user ever-expanding demand for communication bandwidth. The capacity of wireless and wired networks suffered a huge challenge.At the same time,due to the upgrading of the communication technology, traditional communication network has encountered a disruptive competition,and the entire communications industry in China have undergone enormous changes,and data traffic in the network has become the most important growth point of several major businesses.In order to meet the capacity needs of the users of explosive growth,the optical fiber transmission network and the mobile network and the Internet will be developed more quickly. The communications operators not only to focus on network coverage,also "accelerate" the strategy must be implemented. Carriers will increase investment in network construction,efforts to solve the issue of network capacity,and to meet their own high-speed development. How to achieve network construction in "high-quality, efficient ",do support the market’s rapid response,also the various communication carriers think key issues.The authors combine some of the practical situation where the company,and in accordance with the relevant theoretical analysis. Finally the collate obtained optical fiber transmission network engineering, there are some problems in the research, implementation, acceptance and other sectors.(1) Pre-feasibility study is not complete and not fully, can not accurately provide the specific capacity requirements of the construction project;(2) Inaccurate own network inventory resources control, can not be an effective support network and market;(3) The synergy between the departments and services needs to be strengthened;(4) Assessment indicators is not clear enough, need to be strengthened to implement;(5) New technology, new equipment involved in the network of new norms and new indicators is not perfect;(6) Multi-point, a broad area and personnel below normal, cause can not be promptly and accurately grasp the situation at the scene;(7) Equipment material production and procurement of supply link has a problem. And cited the project feasibility analysis, process control, customer retention, team adjustment range of measures. Also put forward the idea of the critical control point, for the overall management of the the Sichuan Mobile optical fiber transmission network engineering construction, the Of provide some strategies and opinions. Finally, by summarizing the analysis concluded:In the optical fiber transmission network project,"Pre is forearmed, without prejudging the waste.".In the current competitive situation, The mobile only well ahead of the optical fiber transmission network planning and construction and combining with the scientific means,the company’s network advantage to continue to be maintained.
Keywords/Search Tags:Optical fiber transmission network, Capacity requirements, Projectstrategy
PDF Full Text Request
Related items