Font Size: a A A

A Research Of The Shanxi Provincial Government Invest In BT Project Construction

Posted on:2013-12-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y F YuanFull Text:PDF
GTID:2249330395970098Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with the economic policies of the state macro-control, the rapid development of economic construction makes national infrastructure investment by the impact of a series of monetary policy. Based on this, a government for, how to become the preparation fund infrastructure construction of the important factors point. In this factor stimulating, seek a new construction mode become the core, and construction mode is in the BT context came into being.BT mode as a new government financing mode, it is to point to the government in infrastructure non-business construction, use the nongovernmental money for construction mode. As a kind of transformation of the BOT model form, BT mode of the implementation of the project of the company include bag, financing, the construction of assembly and after the completion of the project, a series of acceptance of the process. In the process of construction project in BT, mainly has the government or its authorized unit as BT mode the project sponsor, BT model project organizer and BT mode the project company this trio main body participation of the whole project to initiate and implement, the most kind of ensuring that the project engineering the smooth realization of the goal.China’s economic system and the continuing reform of the investment system in which various capital in infrastructure investment increased gradually, use among them BT mode gradually appeared the construction projects and the large scale development. As China’s Shanxi resources, economic development province, in infrastructure construction has a great demand, and tentative adopted BT mode way in infrastructure construction, and has obtained the certain result. Based on the Shanxi Province in infrastructure using BT model development investigation, summarizes the Shanxi Province on infrastructure field development BT mode existing problems, and puts forward some solutions to specific Suggestions.This paper mainly divides into five parts. The article adhere to the principle of the theory with the practice, the use of quantitative analysis and qualitative analysis in this paper, the theory and the empirical research method of combining the, the first part of the first analysis of the Shanxi provincial government investment BT construction project research background, this paper studies on the significance, the goal, the content and the research framework is to expound analysis, the article expounds this research method. This paper mainly adopts the quantitative and qualitative analysis, the method of combining the literature analysis method, questionnaire and combining theory with practice method of purpose of this paper discussed, for the next study good solid foundation. Second, the second part mainly expounds the project of the construction and development of the Chinese BT. The third part according to the questionnaire to the analysis of the Shanxi BT project construction the problems of carry on the summary and analysis, for this investment BT construction project in Shanxi groundwork research. The fourth part is the core content of this paper, mainly in government investment in Shanxi Province is according to the condition of the construction project BT, for their problems were put forward some suggestions in order to the next step of the improvement and growth. The last part of the content on this article is summarized, put forward the innovation points, insufficient and outlook, so that in future study and research.
Keywords/Search Tags:Shanxi, BT projects, Investigation, Countermeasure
PDF Full Text Request
Related items