Discussion On Nuclear Power Project Risk Management In China

Posted on:2014-01-16Degree:MasterType:Thesis
Country:ChinaCandidate:M Y SunFull Text:PDF
GTID:2249330395494144Subject:Project management
Abstract/Summary:PDF Full Text Request
Nuclear power is an important part of power industry system, is one of themajor energy for human application, nuclear power itself has a lot of advantages. Intoday’s international and domestic environmental problems increasingly seriouscases, economic development and promoting the construction of nuclear powerprojects, successfully promoting the construction of China’s nuclear powerconstruction project, on the construction of China’s active development and use ofnew energy has an important meaning. In today’s international and domesticenvironmental problems increasingly serious cases, economic development andpromoting the construction of nuclear power projects, successfully promoting theconstruction of China’s nuclear power construction project, on the construction ofChina’s active development and use of new energy has an important meaning.However the construction of nuclear power projects with characteristics of thecomplex and a very high degree of difficulty, achieving the safe operation of nuclearpower engineering project, is the participation of each and every Builder and thecommon wish of the people, therefore, project risk management is especiallyimportant for nuclear power projects.The main purpose of this paper is to many uncertainties for the current nuclearpower project risk management, a combination of research methods throughliterature research methods and theoretical research and empirical research toidentify the impact Jingyu nuclear power plant project that may exist in a variety ofrisk factorsrisk assessment Jingyu nuclear power projects, and proposed thecorresponding solution countermeasures theory of reference to ensure the smoothprogress of Jingyu nuclear power plant, the ultimate goal is the smooth progress ofthe Jingyu nuclear power plant.Introduction; focuses on thesis writing background, domestic and foreign nuclear power project research and nuclear power engineering project riskmanagement research, the significance of this thesis, papers, research methods andthesis research.Project Risk Management Research; mainly summarizes anddiscusses the project risk management, project risk identification, assessment andanalysis methods, to provide a reliable basis for the risk management of the nuclearpower project. Read in conjunction with the large number of documents, summarizesthe characteristics of the current nuclear power projects, the project managementfeatures of nuclear power engineering, nuclear power project managementmodel.Jilin Jingyu nuclear project risk management case analysis: Jilin Jingyu,introduces the overview of nuclear power projects, its comprehensive approach torisk management, and then summed up the risk analysis and identification of nuclearpower projects, as well as nuclear power engineering project risk assessmentmethods.Nuclear power project in Jilin Jingyu risk response measures; Jilin Jingyueconomic risks of nuclear power projects, technology risks, the risk of managementand staff, safe and natural combination of the first three chapters analyze andsummarize the results of theoretical studies, based on in-depth analysisenvironmental risks, equipment and materials risk and risk response measures, inorder to make it efficient and orderly and safe operation.
Keywords/Search Tags:Nuclear power projects, Risk management, Jilin Jingyu nuclear powerengineering
PDF Full Text Request
Related items