Font Size: a A A

T Company Thermal Power Plant Steam To Change The High Temperature Water Supply Network Project For Economic Assessment Study

Posted on:2013-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y BaiFull Text:PDF
GTID:2249330377452240Subject:Project management
Abstract/Summary:PDF Full Text Request
Thermal Power Plant is the main heat source of China’s urban central heating, isalso an important complement to our grid power, the energy consumption of China’stotal energy consumption in a large proportion. China’s thermal power plants arebasically using coal as fuel, the energy utilization efficiency can only reach about45%. With the continuous development of China’s industrial economy, theconsumption of coal resources, the rising prices of domestic coal, the late start due torelative overseas development for our cogeneration industry, the technology isrelatively backward, combined heat and power enterprises increased production costscaused by rising coal prices, leading to the loss of most of the enterprises, with thenational12th five economic restructuring, local financial subsidies alone, it is difficultto make sustainable development of enterprises, so the energy saving andtechnological innovation is an urgent task of enterprise; also to protect theenvironment, improve people’s living standards and the promotion of sustainablesocio-economic development measures.In this paper, the T Company Thermal Power Plant steam to change the hightemperature water supply network project for the study, pointed out the importance oftechnical transformation projects, this paper introduces the T Company ThermalPower Plant steam changed the high-temperature water distribution network generatedby the project background, purpose and significance. Systematically expounded thetheory and methods of project evaluation, heat and power plant steam, T Inc. tochange the high temperature water supply network project from technical, economic,social and other aspects were analyzed in accordance with the elements of the projecteconomic evaluation. Paper uses a value analysis, decision analysis, risk analysis and other methods,quantitative analysis, quantitative analysis and qualitative analysis of the combinationof the need to change the T Company Thermal Power Plant steam of high temperaturewater supply network projects, market prospects, project risk, content of projects,investment planning and financing, the economic benefit evaluation and uncertainty,social and other aspects of the in-depth and detailed study. The focus is on theproject’s financial efficiency indicators were evaluated. The paper combines a varietyof analytical results, indicating that the economic benefit of the project, social good,with application value.
Keywords/Search Tags:T Company Thermal Power Plant, steam to change the hightemperature water supply network project, economic evaluation
PDF Full Text Request
Related items