Font Size: a A A

Research On Schedule And Control Of The Promotion Of Wanhua Bills Pool

Posted on:2013-11-29Degree:MasterType:Thesis
Country:ChinaCandidate:L S YongFull Text:PDF
GTID:2249330371979442Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The theory of schedule and control on Project applying into creation becomesthe main areas of research area, whether necessary to apply it, and how to apply it isthe key and also the difficult factor in this article, anyhow, the schedule and controlon Project is the two key nodes to achieve the aim. The necessity and feasibilityresearch lay the foundation of Wanhua bills pool role, and, the effect schedule andprior arrangements in advance will realize to establish new bank products and applythem in practice,which will increase the working efficiency effectively.The whole article includes four chapters, the first chapter describes the project’sbackground and signification of the subject, the theory of management on projectionin the new creation of commercial bank products will improve the completion ofbanks’ creation management and ensure that financial innovation project completesucessfully.The other chapters are the thematic parts of the article, making Wanhuabills pool for research aim, using the knowledge of projection and management ofcontrolling, making deep research, gradually establishing the progress andcontrolling system during the bank creation promotion.First of all, the article starts with the example of reality of Yantai branch,demonstrate the necessity and feasibility of the progress and controlling system, andmakes arrangements on the concepts and ideas.Secondly, with the micro actors, the article raised the progress and controllingsystem of Wanhua bills pool,through surveys, projects, analysis of the relationship between responsibility and work duty with network analysis and optimizationtechniques to quantify the project schedule.Thirdly, the article focuses on the construction progress organization,designation and perfection of the management, establishing and perfecting the projectprogress control system.Finally, through the study of this project, the article raised three conclusions. Thefirst one is that the target project must have an overall plan, and must also havespecific objectives in detail. The second one is that the project extension shouldinclude not only the second plan, must also have good control measures. The thirdone is that the project planning and control is a dynamic process, and is under theguidance of a scientific theory of art.
Keywords/Search Tags:Bill pool, Promotion project, Schedule, Schedule control
PDF Full Text Request
Related items