Research On Management And Control Of Zhengxi Substation Civil Works Costs

Posted on:2013-05-24Degree:MasterType:Thesis
Country:ChinaCandidate:Q GongFull Text:PDF
GTID:2249330371975774Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Face of increasingly fierce market competition, electric power construction to finding a development, and efficiency is essential. In order to improve enterprise efficiency, on the one hand, we must actively explore the market, contract engineering, participate in the bidding and other methods to do the "open source", on the one hand, to strengthen cost management and control, and explore the "throttling" individual project cost control.500kV substation civil works, of the Zhengzhou-Xi’an Zhengzhou Electric Power Construction Corporation from2010to2011a key projects, thesis research and analysis of the cost of the project management situation, learn from the experience, lessons learned and explore countermeasures, in order to improve the substation cost Management of civil engineering.Papers:brief overview and construction deployment of Zheng West substation civil works; detailed engineering cost management processes and to analyze, summarize the cost of the project management experience from different perspectives, different side, find the problems in the management of five aspects of the problems in the bidding process engineering, materials management, the degree of information, completion of final accounts management, establish evaluation system, in-depth analysis and discussion of proposed management measures for the above problem: improve the "three tender system, strict implementation of tendering procedures; the implementation of intensive materials procurement and materials management of information technology; to establish and promote the use of cost data; the whole construction process should be for the completion of final accounts; improve the responsibility system for project managers, cost assessment to establish a scientific system.The contribution of the paper is a comprehensive summary of the the500kV Zheng West substation civil works cost management and control experience, find the problems and study measures. Research methods and conclusions, the manager of the Zhengzliou Electric Power Construction Group can provide the reference of the cost of the project management, also provides a theoretical guidance for substation civil works project cost management and technical support.
Keywords/Search Tags:civil engineering project management, cost control
PDF Full Text Request
Related items